Browse
Search
Agenda - 06-26-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-26-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 4:20:31 PM
Creation date
11/1/2017 4:02:02 PM
Metadata
Fields
Template:
BOCC
Date
6/26/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
u <br />ARTICLE 1 <br />THE CONTRACT DOCUMENTS <br />The Contract Documents consist of this Agrccrrlcm, Conclilions or thc• Contract (Gcncr;il, tiupplcmc <br />Drawings, S)ecificationS, Addencla issued prior ut execution of this :�grCCtlxrr, i thCr documcn[ti listcci in (his :�,qc•l nl_ ;;: _utci <br />ModifiCations issued after cxCCUtitm of this Agrecnteru; thCSC: form the Contract, and arc as full.- a part of [hc C:ontra <t as it a!t:u: hoc! <br />to this :Agreement or repeated herein. The: Contract represents floe entire and inteur ;toed agreerticm hco;vice•ll the p ;:rmzC itcrcu xi,! <br />Supersedes prior negotiations, representations or anrec inents, either o\" ritten or oral. An CnunlCratiorl ol` hC <br />other than 1\4oxlifications, appears in Articic 9. <br />ARTICLE 2 <br />THE WORK OF THIS CONTRACT <br />The Contractor shall execute the entire V('ork described in the Contract Docunlen[S, except to the extent specifically incliCa[cci in <br />the Contract Documents to be the responsibility Of others, or as follows: <br />ARTICLE 3 <br />DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION <br />3.1 The date of commencement is the date from which the Contract Time of Paragraph 3.2 i5 mCasured, and Shall he the date or <br />this Agreement, as first written above, unless a different date is stated below or provision is made for the date to be fixed in a notice <br />to proceed issued by the Owner. <br />(insert the tittle of co.nmenceme+t, if it differ :c from Thc• Ante of tins Agreennenl or, if upplicahle, state lbal The tittle trill he fixed All a rtnlice to proceed.) <br />The date of convenoement fo work will be established at a later date with a Notice <br />t,P Pocked issued b the Ogr <br />Un ess t e ate of commence en[ is esta 1s Ted by a notice to proceed issued by the Owner, the Contractor shall notify the <br />Owner in writing not less than Five days before commencing [he Work to permit the timely filing of mortgages, mechanics liens <br />and other security interests. <br />3.2 The Contractor shall achieve Substantial Completion of the entire Work not later than <br />(insert the culevulur r /eta• ur+nuaner ref cr+lendardrps after the elute q c-o+nincticeinenr. Ilso insert u+ {r r eyuire•mentsJnr eurlrer Suhslnttliut tJrlt+tptc•li, it of re•r- <br />luin portions of lie Work, if nor slater! else« •here in the Contract Duc•unnenls.) <br />240 Calendar days after the date established in the Notioe to Proceed. <br />, subject to adjustments of this Contract Timc as provided in the Contract DOCLIMC11[5. <br />th+Fert I) rrn•isiunc, il-rn!t•. Jilt' ligrlidrrled dtan({gec r- ell uiog to fiihov to contplele nn lime.) <br />The Contractor shall be assessed $100.00 per day for liquidated damages for <br />failure to complete the project on time. <br />AIA DOCUMENT A101 • OWNER- CONTRACTOR AGRF,EMENT • TWEI.F"I -H EDITION • AIA" • 01987 <br />THE AMERICAN INS•t•17'UTE OF ARCHITECTS. 1735 NEVI` YORK AVENUE, N.W. WASHINGTON, D.C. 2(XWi A101 -1987 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.