Orange County NC Website
16 <br />ARTICLE 14.2.3 SPECIFICATION FOR PLAN PREPARATION (continued) <br />PLANNING PLANNING <br />STAFF BOARD <br />RECOMMENDED RECOMMENDED <br />FINDINGS EVIDENCE SUBMITTED TO SUPPORT FINDINGS FINDINGS <br />Ordinance Requirements <br />m) Solid waste disposal <br />_x—Yes No <br />Solid waste will be collected by <br />Yes No <br />facilities <br />private contractor. <br />n) All free - standing and wall- <br />_x—Yes No <br />The entrance sign is indicated on <br />Yes No <br />mounted signs in accordance <br />the site plan. <br />with Article 9 of the Zoning <br />ordinance <br />o) A landscape plan demonstrating <br />_x—Yes No <br />A landscape plan has been submitted. <br />Yes No <br />compliance with Article 12.3 of <br />The property is presently wooded <br />the Zoning Ordinance <br />and the applicant indicates there <br />will be minimal clearing. <br />p) Existing contour lines (dashed) <br />_x—Yes No <br />Contour lines are indicated on the <br />Yes No <br />and proposed contours (solid) at <br />site plan. <br />5 -foot intervals with 10 -foot <br />contours bold. Where site <br />conditions warrant, 2 7foot <br />contours may be required <br />q) Retaining walls, tree wells, <br />_x—Yes No <br />A grading plan will be submitted to <br />Yes No <br />or rip rap as part of the grading <br />the Erosion Control Officer prior <br />plan <br />to construction. <br />r) Streams, ponds, drainage <br />_x—Yes No <br />The site plan indicates there are no <br />Yes No <br />ditches., swamps, f.loodway and <br />streams, ponds or flood areas on the <br />floodplain boundaries <br />property. Drainage ditches will be <br />determined by the Erosion Control <br />Officer on the Erosion Control Plan. <br />s) Phase lines and numbers if <br />_x —Yes No <br />Phasing is not proposed. <br />Yes No <br />the development is to be phased <br />