Browse
Search
Agenda - 06-26-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-26-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 4:20:31 PM
Creation date
11/1/2017 4:02:02 PM
Metadata
Fields
Template:
BOCC
Date
6/26/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
684
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />• ARTICLE 8.2.1 ! APPLICATION COMPONENTS (continued) <br />PLANNING PLANNING <br />STAFF BOARD <br />RECOMMENDED RECOMMENDED <br />FINDINGS EVIDENCE SUBMITTED To SUPPORT FINDINGS FINDINGS <br />Ordinance Requirements <br />3. The use is in compliance <br />with the general plan for <br />the physical development of <br />the County as embodied in <br />these regulations or in the <br />Comprehensive Plan, or portion <br />thereof, adopted by the Board <br />of County Commissioners. <br />Is Is Not To be determined by Board <br />after receiving evidence to be <br />submitted or heard at public <br />hearing. <br />13 <br />Is Is Not <br />ARTICLES 8,_6 AND 8_8 - APPLICATION COMPONENTS "Yes" indicates com lD iancei "No" indicates Non -com liance <br />PLANNING PLANNING <br />STAFF BOARD <br />RECOMMENDED RECOMMENDED <br />FINDINGS EVIDENCE SUBMITTED TO SUPPORT FINDINGS FINDINGS <br />Ordinance Requirements <br />8.6 - Application submitted _,x —Yes No <br />on forms providing full and <br />accurate description of <br />proposed use, including <br />Location, appearance and <br />operational characteristics <br />8.8 a) - Twenty -six (26) copies _x —Yes No <br />of the site plan prepared by a <br />registered land surveyor or <br />engineer <br />8.8 b) - Elevations of all _x—Yes No <br />proposed structures to be <br />used in the development <br />8.8 c) - A fee, as set by the _x—Yes No <br />Board of County Commissioners <br />A complete application on appropriate Yes No <br />forms has been submitted. <br />Twenty -six copies of the site plan, Yes No <br />prepared by ENT Land Surveys, have <br />been submitted. <br />Typical singLe wide mobile homes Yes No <br />are shown on the site plan. <br />$1,840.00 application fee has been Yes No <br />paid. <br />
The URL can be used to link to this page
Your browser does not support the video tag.