Browse
Search
Agenda - 06-04-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-04-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:39:38 PM
Creation date
11/1/2017 12:29:43 PM
Metadata
Fields
Template:
BOCC
Date
6/4/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reserved rights, including the copyright. The Owner shall <br />copies, of <br />be permitted to retain copies.�icataonsrand otherldocuments for <br />the Architect's Drawings, Spec i , <br />information and reference in connection with the Owner's use and <br />occupancy of the Project. The Architect's Drawings, the Owner <br />Specifications or other documents shall not be used by <br />or others on other projects, for additions to this Project, or <br />for completion of this Project by others, unless the Architect is <br />adjudged in default under this Agreement, except by agreement <br />in writing and with appropriate compensation to the Architect. <br />The Owner may use the Drawings, Specifications and other <br />documents prepared by the Architect for making repairs, modifica- <br />tions, additions, or renovations of this Project without the <br />knowlege or prior consent of the Architect, provided the Owner <br />agrees to waive any claim against the Architect and defend, and <br />indemnify to the extent permitted by law, and hood the Architect <br />harmless from any claim or liability for injury <br />alledgedly arising from each use of said documents by Owner <br />without participation of the Architect. <br />Article 7, Negotiation and Dispute Resolution, shall.read: <br />7.1: The Owner and Architect agree to endeavor to provide <br />written notification in advance of any litigation, concerning <br />claims, disputes, and other matters in question between the <br />parties to this Agreement arising out of or relating to this <br />Agreement or the breach thereof. <br />7.2: The parties agree to endeavor todt <br />negotiate mother faith <br />prior to litigation, concerning claims, P to this Agreement <br />matters in question arising out of or relating <br />or the breach thereof. <br />7.3: Nothing herein contained shall be construed to require <br />the parties to p require <br />rovide written notification or engage <br />negotiations prior to the institution y r partiesr,, anyrsuch <br />submit for arbitration by a third party or P parties, <br />claim, dispute or other matter in question between the P dispute <br />but the parties may by mutual agreement submit any claim, P <br />or other matter at issue to arbitration in accordance with the or <br />North therlarbitration procedure asAmay be mutually agreed upon <br />such other <br />between the parties. <br />Article 10, paragraph 10.2.1 shall read: Reimbursable expenses <br />are in addition to compensation for basic and additionalbserviCes. <br />*Reimbursable expenses include the <br />Architect and Architect's employees h�.tect isdto be consultants in the <br />for <br />interest of the project. <br />actual cost of reproduction, postage and handling of drawings, <br />specifications and other documents for the office use of the <br />Architect, the Architect's consultants, the Owner, and <br />Contractor. in advance and in <br />* Delete "...and they must be approved <br />writing by the owner . "• <br />19-1: <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.