Browse
Search
Agenda - 06-04-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-04-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:39:38 PM
Creation date
11/1/2017 12:29:43 PM
Metadata
Fields
Template:
BOCC
Date
6/4/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MA <br />If the Owner deems that such services described under paragraph <br />3.3 are not required, the Owner shall give prompt written notice <br />to the Architect. If the Owner indicates in writing that all or <br />part of such Contingent Additional Services are not required, <br />the Architect shall have no obligation to provide those <br />services. If however, The Owner indicates that, in his <br />Opinion, the services described under paragraph 3.3 are required, <br />due to circumstances within the control of the Architect, and <br />directs such services be provided as part of Basic Services, <br />the Architect reserves the right to furnish said services and <br />file a claim for additional payment. <br />Article 3, paragraph 3.2.1 shall read: If the Owner and Architect <br />agree that more extensive representation at the site than is <br />described in Subparagraph 2.6.5 is required, the Architect shall <br />provide one or more Project Representatives to assist in carrying <br />out such additional on -site responsibilities, as Additional <br />Services. <br />Article 3, paragraph 3.3.3, shall read: Preparing Drawings, <br />Specifications, and other documentation and supporting data, <br />(evaluating contractors' proposals deleted ) and providing other <br />services in connection with Change Orders and Construction Change <br />Directives, provided such change orders and construction change <br />directives ate required by causes not within the control of the <br />Architect. <br />Article 3, paragraph 3.4.1, is deleted. <br />Article 3, paragraph 3.4.6, should be included as Basic Services, <br />but only in order to arrive at a program of space needs. <br />Article 3, paragraph 3.4.16, is deleted. <br />Article 5, paragraph 5.2.2 shall read: A fixed limit of <br />construction cost has been mutually agreed upon by the Owner and <br />the Architect, as set forth in Article 11 of this Agreement. The <br />Architect shall be permitted to include contingencies for design, <br />bidding and price escalation, to determine what materials, <br />equipment component systems and types of construction are to be <br />included in the Contract Documents to make reasonable adjustments <br />in the scope of the Project and to include in the Contract <br />Documents alternate bids to adjust the construction cost to <br />the fixed limit. Any such fixed limit shall be increased in the <br />amount of any increase in the contract sum occurring by <br />change order after execution of the contracts for construction. <br />Article 6, paragraph 6.1 shall read: The Drawings, <br />Specifications, and other documents prepared by the Architect for <br />this Project are instruments of the Architect's service for use <br />solely with respect to this Project, and, unless otherwise <br />provided, the Architect shall be deemed the author of these <br />documents and shall retain all common law, statutory, and other <br />5-M <br />
The URL can be used to link to this page
Your browser does not support the video tag.