Browse
Search
Agenda - 06-04-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-04-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:39:38 PM
Creation date
11/1/2017 12:29:43 PM
Metadata
Fields
Template:
BOCC
Date
6/4/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(u) In Article 3 amend paragraph 3.3.3 by eliminating and striking <br />from line two of said paragraph the words: "evaluating <br />Contractors proposals ", and at the end of said paragraph <br />adding the following language: "provided such change orders <br />and construction change directives are required by causes not <br />within the control of the Architect." <br />(v) In Article 3 strike out and delete paragraph numbered 3.4.1. <br />(w)- In Article 3 strike out and delete paragraph numbered 3.4.6. <br />(x) In Article 3 strike out and delete paragraph numbered 3.4.16. <br />(y) In Article 5 amend paragraph 5.2.2 to read as follows: "A <br />fixed limit of construction cost has been mutually agreed upon <br />by the Owner and the Architect as set forth in Article 11 of <br />this agreement. The Architect shall be permitted to include <br />contingencies for design, bidding and price escalation, to <br />determine what materials, equipment component systems and <br />types of construction are to be included in the contract <br />documents, to make reasonable adjustments in the scope of the <br />project and to include in the contract documents alternate <br />bids to adjust the construction cost to the fixed limit. Any <br />such fixed limit shall be increased in the amount of any <br />increase in the contract sum occurring by change order after <br />execution of the contracts for construction." <br />(z) In Article 6 amend paragraph number 6.1 by deleting from line <br />14 the words: "adjudged to be" and by adding at the end of <br />the original provisions of said paragraph the following <br />additional language: "The Owner may use the drawings, <br />specifications and other documents prepared by the Architect <br />for making repairs, modifications, additions and or <br />renovations of this project without the knowledge or prior <br />consent of the Architect provided the Owner agrees to waive <br />any claim against the Architect and defend, and indemnify to <br />the extent permitted by law, and hold the Architect harmless <br />from any claim or liability for injury or loss allegedly <br />arising from each use of said documents by Owner without <br />participation of the Architect." <br />Page 5 of 7 - Appendix "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.