Browse
Search
Agenda - 06-04-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-04-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:39:38 PM
Creation date
11/1/2017 12:29:43 PM
Metadata
Fields
Template:
BOCC
Date
6/4/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(f) In Article 2 strike out original provisions of paragraph 2.4.2 <br />and insert in lieu thereof the following as paragraph 2.4.2: <br />"The Architect, after consultation with the Owner, shall <br />prepare the necessary bidding information and bid forms to <br />comply with public building laws as set forth in North <br />Carolina General Statutes Chapter 143, including the necessary <br />information required by Chapter 87 of the North Carolina <br />General Statutes pertaining to the licensing of contractors, <br />and shall assist the Owner in the preparation of the <br />conditions of the contract and the form of the agreement <br />between the owner and the General and Prime Contractors." <br />(g) In Article 2, paragraph 2.4.3 amend line two by striking out <br />words "preliminary estimates of" and inserting in lieu thereof <br />the language: "statements of probable "; and in line three of <br />said paragraph immediately preceding the word "requirements" <br />insert the following: "scope of the work, ". <br />(h) In Article 2 immediately following paragraph 2.4.4 add the <br />following new paragraph which shall be paragraph numbered <br />2.4.5 providing: "The Architect shall include in the bidding <br />information, plans or specifications a requirement that Prime <br />Contractors provide operation manuals and adequate training <br />for the Owner in the operation of mechanical, electrical, <br />heating and air - conditioning systems installed by the Prime <br />Contractors." <br />(i) In Article 2 immediately following paragraph numbered 2.5.1 <br />add the following paragraph numbered 2.5.1 reading: "In the <br />event the lowest responsible bids exceed the funds <br />appropriated for the project, the Architect, in consultation <br />with and at the direction of the Owner, shall provide such <br />modifications in the contract documents as shall be necessary <br />to bring the cost of the proj ect within the proj ect I s budget. " <br />(j) In Article 2 amend paragraph 2.6.2 by striking out the word <br />"the" in first line immediately after the word "of" and <br />inserting in lieu thereof "all Prime ", and by adding an "SIT <br />at the end of the first word ending in line 2, and at the end <br />of said paragraph changing the period to comma and adding the <br />following additional language: "as amended by the Owner." <br />(k) In Article 2 amend paragraph 2.6.3 by inserting at the <br />beginning and immediately prior to the original provisions of <br />said paragraph the words "construction phase ", and in third <br />line immediately following the word "Architect" insert "and <br />notice to prime contractors." and striking out the remaining <br />original provisions of said paragraph. <br />Page 2 of 7 - Appendix "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.