Browse
Search
Agenda - 06-04-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-04-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:39:38 PM
Creation date
11/1/2017 12:29:43 PM
Metadata
Fields
Template:
BOCC
Date
6/4/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX "All TO 911 CENTER BUILDING CONTRACT <br />(a) In Article 1, paragraph 1.2.2 is amended by inserting in the <br />sixth line immediately following the word "adjusted" the <br />following additional language: "by mutual agreement of the <br />Owner and the Architect, ". <br />w <br />(b) In Article 2, paragraph 2.1.1 is amended in line four by <br />striking out words "engineering services" and insert in lieu <br />thereof the following: "and any other engineering services <br />necessary to produce a complete and accurate set of <br />construction documents as described in paragraph 2.411. <br />(c) In Article 2, paragraph 2.2.1 change period at end of original <br />provisions to comma and insert the following language: "shall <br />submit such understanding in writing, and shall furnish a copy <br />to the Owner for its approval before proceeding with <br />preliminary designs." <br />(d) In Article 2 immediately following paragraph 2.3.2 add <br />following additional paragraph designated 2.3.3 providing: <br />"The Architect shall consider the placement of windows to use <br />the climate of North Carolina for both light and ventilation <br />in the case of power shortages and also shall consider the <br />installation of solar energy systems in the design of these <br />facilities as required by NCGS 115C- -521 (c)." <br />(e) In Article 2 amend paragraph 2.4.1 by striking out in lines <br />.six and seven the words "requirements for the construction of <br />the project" and insert in lieu thereof: "work required for <br />the architectural, structural, mechanical, electrical, <br />service - connected equipment, and site work, and the necessary <br />the general conditions of the contract. He shall provide the <br />services of professional structural, mechanical, civil and <br />electrical engineers, qualified by training and experience in <br />their respective fields as needed to address the requirements <br />of the project; and shall,require such professional engineers <br />to place their seal, name and signature on the drawings and <br />specifications prepared by them." <br />Page 1 of 7 - Appendix "A" <br />
The URL can be used to link to this page
Your browser does not support the video tag.