Orange County NC Website
11.5.3 The rates and multiples set forth for Additional Services shall be annually adjusted in accordance with normal salary review <br />practices of the Architect. <br />ARTIC'I F 19 t <br />a ` OTHER CONDITIONS OR SERVICES <br />(Insert descriptions of other services, identify Additional Services included tritbi n Basic Compenscalon and modificenions to U)e payment and compensation teens <br />Included in this Agreement.) <br />A. The construction cost budget for this project has been established at <br />$250,000. If the Owner increases the budget, for any reason, the fee <br />for the Architect shall be increased on the .same percentage basis as <br />for the original contract. <br />Should the amount of the low bids for construction exceed the amount <br />of the established budget, and the Owner-does-not increase the budget, <br />the Architect shall do whatever is necessary to reduce the cost of the <br />project, to come within the budget amount, without additional fee. <br />The Owner will not "request that construction alternates be designed, <br />that would cause the project cost to exceed the established budget, <br />without increasing the Architect's fees.on the same percentage basis <br />as the original contract;. using the estimated amounts of the alternates. <br />This clause is effective notwithstanding any other clauses, included <br />in the contract, to the contrary. <br />B. The contract is modified in accordance with APPENDIX "A" <br />This Agreement entered into as of the day and year first written above. <br />• I.AI . <br />W-930 W <br />?.096- Pv M)1 <br />GEORGE M. SMART, ARCHITECT'S, INC. <br />Gorge Smart, AIA <br />Chief Executive Officer <br />3 -30 -90 <br />AIA DOCUMENT B141 • OWNER - ARCHITECT AGREEMENT • FOURTEENTH EDITION • AIA® • 9)1987 <br />THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.C. 20006 8141 -1987 10 <br />