Orange County NC Website
11.2.2 Where compensation is based on a stipulated sum or percentage of Construction Cost, progress payments for Basic Services <br />in each phase shall total the following percentages of the total Basic Compensation payable: <br />(Insert additional pleases as appropriate.) <br />Schematic Design Phase: <br />Design Development Phase: <br />Construction Documents Phase: <br />Bidding or Negotiation Phase: <br />Construction Phase: <br />Total Basic Compensation: <br />11.3 COMPENSATION FOR ADDITIONAL SERVICES <br />4. <br />Fifteen <br />percent (15 %) <br />Twenty <br />percent (20 %) <br />Forty <br />percent (40 %) <br />Five <br />percent ( 5 %) <br />TwentV <br />percent (20 %) <br />one hundred percent (100 %) <br />11.3.1 FOR PROJECT REPRESENTATION BEYOND BASIC SERVICES, as described in Paragraph 3.2, compensation shall be com- <br />puted as follows: <br />Additional services will be provided only when authorized by the County; <br />after negotiating a. reasonable fee with :the Architect. <br />Generally, a.fee based on a percentage of construction cost will be used <br />unless either party feels that it is unreasonable. Should.hourly services <br />become the basis, a multiple of 2.0 times the technical payroll plus 10 <br />percent profit will be the basis for determining the fee. <br />11.3.2 FOR ADDITIONAL SERVICES OF THE ARCHITECT, as described in Articles 3 and 12, other than (1) Additional Project <br />Representation, as described in Paragraph 3.2, and (2) services included in Article 12 as part of Additional Services, but excluding ser- <br />vices of consultants, compensation shall be computed as follows: <br />(Insert basis of compensation, including rates andlor multiples of iJirect Personnel Expense for Principals and employees, and identify Principals and classify <br />employees, if required. Identify specific services to which particular metbods of compensation apply, if necessary.) <br />Additional services will be provided only when authorized by the County. <br />Generally, a fee based on a percentage of construction cost will be used <br />unless either party feels that it is unreasonable. Should hourly services <br />become the basis, a multiple of 2.5.times the technical payroll plus 10 <br />percent profit will be the basis for determining the fee. <br />11.3.3 FOR ADDITIONAL SERVICES OF CONSULTANTS, including additional structural, mechanical and electrical engineering <br />services and those provided under Subparagraph 3.4.19 or identified in Article 12 as part of Additional Services, a multiple of <br />one point ten ( 1.10 ) times the amounts billed to the Architect for such services. <br />(/dent jy specific types of consultants In Article 12, if required.) <br />11.4 REIMBURSABLE EXPENSES <br />11 A.1 FOR REIMBURSABLE EXPENSES, as described in Paragraph 10.2, and any other items included in Article 12 as Reimbursable <br />Expenses, a multiple of one point ten ( 1.10 ) tunes the expenses incurred by the Architect, the Architect's <br />employees and consultants in the interest of the Project. <br />11.5 ADDITIONAL PROVISIONS <br />11.5.1 IF THE BASIC SERVICES covered by this Agreement have not been completed within fourteen <br />( 14 ) months of the date hereof, through no fault of the Architect, extension of the Architect's services beyond that time shall be <br />compensated as provided in Subparagraphs 10.3.3 and 113.2. <br />11.5.2 Payments are due and payable dirty ( 30 ) days from the date of the Architect's invoice. <br />Amounts unpaid sixty ( 60 ) days after the invoice date shall bear interest at the rate entered below, or <br />in the absence thereof at the legal rate prevailing from time to time at the principal place of business of the Architect. <br />(insert rate of interest agreed upon.) prime rate plus one (1) percent. <br />(Usury laws and requirements under The Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the Owner's and Arcbi- <br />lect's principal places of business, the location of the Project and elsewbere may affect The validity of this provision. Specoc legal advice sbould be obtained with <br />respect to deletions or modificalions, and also regarding requirements such as written disclosures or waivers.) <br />AIA DOCUMENT 8141 • OWNER - ARCHITECT AGREEMENT • FOURTEENTH EDITION • AIA® • 01987 <br />9 B141-1987 THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W., WASHINGTON, D.G. 20006 <br />