Browse
Search
Agenda - 06-04-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 06-04-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:39:38 PM
Creation date
11/1/2017 12:29:43 PM
Metadata
Fields
Template:
BOCC
Date
6/4/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
394
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ESRI j Envk0nffNV" SYs^s Rasaaro Institute. Wc. <br />JJ23 <br />be changed by mutual consent of ESRI and the County. This installation shall include the <br />successful interfacing and testing of equipment according to standard procedures associated with <br />each manufactured item of the system. The unpacking and placement of equipment shall be the <br />joint responsibility of the equipment vendor and the County, with ESRI providing coordinative <br />support. <br />During the installation period, ESRI shall coordinate with the hardware vendor to guide the <br />County's system administrator on the installation and administration of the new hardware system <br />as it relates to the operation of ARCANFO and related ESRI software. As the two parties work <br />together es needed to install and administer ARC INFO and related guided <br />on theequipment. <br />procedure <br />The following will be covered: <br />• Starting up the system and individual devices and shutting them down in an orderly <br />fashion <br />• Checking disk space availability, obtaining files and directory listings, setting up <br />accounts and permission/access rights, and creating work spaces for the software <br />• Loading and/or restoring files on tape <br />• Modifying user line and terminal settings where necessary. <br />B.4 iv <br />- Hardware System as ordered <br />- Interfaced Hardware <br />- Performance (Acceptance) Tests <br />- Users familiarized in operation of hardware <br />a. The County shall designate a person to act as system administrator who will learn the <br />procedures for system installation, operation, maintenance coordination, and problem <br />identification. <br />b. The County shall, at its own expense, prepare the designated site in accordance with <br />specifications and communications with a member of ESRI's staff. These preparations <br />shall include installation of appropriate electrical wiring, air conditioning, heating, humidity <br />control, lighting, and space for hardware components. <br />c. ESRI shall coordinate the shipping, insurance, and delivery of the various hardware <br />components, including communication with the County regarding appropriate logistics. <br />d. The County shall provide appropriate insurance coverage for the equipment after delivery. <br />A90- PO101/BB -19- 4/17/90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.