Orange County NC Website
109 .5 <br />A . RTICLE 14. .3 SPECIFICATION FOR PLAN PREPARATION continued) <br />PLANNING <br />PLANNING BOARD <br />STAFF RECOMMENDED <br />RECOMMENDED <br />FINDINGS EVIDENCE SUBMITTED TO SUPPORT FINDINGS FINDINGS <br />ordinance RR gjC' meets <br />m) Solid waste disposal —x—Yes No <br />facilities <br />n) All free - standing and well- ,x-Yes No <br />mounted signs i .accordance <br />with Article 9 of the Zoning <br />Ordinance <br />o) A landscape plan demonstrating _X—Yes No <br />compliance with Article 12.3 of <br />the Zoning Ordinance <br />p) Existing contour lines (dashed) __x__Yes No <br />and proposed contours (solid) at <br />5 -foot intervals with 10 -foot <br />contours bold. Where site <br />conditions warrant, 2 -foot <br />contours may be required <br />q) Retaining walls, tree wells, ,x_Yes No <br />or rip rap as part of the grading <br />plan <br />r) Streams, ponds, drainage _x--yes Nc <br />ditches, swamps, floodway and <br />floodplain boundaries <br />s) Phase lines and numbers if lx —Yes No <br />the development is to be phased <br />• <br />Solid waste will be collected by Yes No <br />private contractor. <br />The entrance sign is indicated on Yes No <br />the site plan. <br />A landscape plan has been submitted. Yes No <br />The property is presently wooded <br />and the applicant indicates there <br />will be minimal clearing. <br />Contour lines are indicated on the Yes No . <br />site plan. <br />A grading plan will be submitted to Yes No <br />the Erosion Control officer prior <br />to construction. <br />The site plan indicates there are no Yes No <br />streams, ponds or flood areas on the <br />property. Drainage ditches will be <br />determined by the Erosion Control <br />officer on the Erosion Control Plan. <br />Phasing is not proposed. Yes No <br />