Orange County NC Website
094 <br />the approved space numbering /location system 6. <br />plan. <br />13. Removal of snow and ice from the roads in the <br />development and the sidewalks within the <br />development shall be the responsibility of the <br />owner of the park. Such removal shall be <br />completed promptly. <br />14. Prior to the start of any construction, the final <br />plans for the water system must be approved by <br />the Town of Hillsborough, the State and the <br />Orange County Engineer. The final plans for the <br />sewage system must also be approved by the Town <br />of Hillsborough, the State and the Orange County <br />Engineer prior to the start of construction. <br />15. Water and sewer lines shall be installed and <br />approved prior to the issuance of an occupancy <br />permit. <br />16. The project must remain in unitary ownership and <br />no lots can be sold to individuals. <br />17. A final boundary survey of the Planned <br />Development and improvements shall be recorded by <br />the developer. <br />18. The final site plan and narrative of the project <br />incorporating all changes, deletions and <br />additions through the final approval of the <br />project are incorporated herein and made a part <br />of this Planned Development Special Use Permit. <br />A copy of the final site plan and narrative are <br />on file with the Orange County Planning <br />Department. Grading and building permits, upon <br />application, will be issued after approval and <br />recordation of the Special Use Permit. <br />19. The development shall be built and operated <br />according to the site plan and written narrative <br />supplied by the developer and in compliance with <br />the above conditions. <br />