Browse
Search
Agenda - 05-15-1990 (2)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 05-15-1990 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:27:48 PM
Creation date
11/1/2017 12:13:24 PM
Metadata
Fields
Template:
BOCC
Date
5/15/1990
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
532
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />f) Conclusions and Recommended Improvements <br />Levels of service for all roadways and signalized <br />intersections serving 10 percent or more of eak -hour <br />ro ect traffic shall be [listed] Mort.,ed. All roadways <br />and /or signalized intersections showing a level of servii <br />below D in urban or develo ed areas r below C in rural <br />areas shall be considered deficient, and specific <br />recommendations for the elimination for these problems <br />shall be listed. This listing of recommended improvement <br />shall include, but not be limited to the following <br />elements: internal circulation design, site access locat, <br />and design, external roadway and intersection design and <br />improvements, traffic signal installation and operation <br />including signal timing, and transit service [design] <br />improvements. All physical roadway improvements shall b, <br />shown in sketches. <br />[The listing of recommended improvements for road <br />improvements shall include for each improvement, the par, <br />responsible for the improvement, the cost and funding of <br />the improvement, and the completion date for the <br />improvement.] <br />2� <br />e <br />s <br />on <br />(The proposed amendments specify the roadways and <br />intersections for which levels of service shall be <br />determined and specify volumes below level of service D in <br />urban or developed areas as the threshold for deficiency). <br />13.5 Submission and Im lementati n <br />The traffic impact study will b <br />Planning Department within the <br />below. The Planning Department <br />the development review process. <br />incorporated into the approval <br />a) Zoning Changes <br />1. Time of Submission <br />e submitted to the Orange County <br />applicable time frame indicate <br />will review the study as part <br />Recommendations will be <br />process as indicated below. <br />The traffic impact study shall be submitted to the Pla <br />Department with, and as a Rart of the application for <br />zoning change. <br />2. implementation <br />The Planning Department and such other agencies or <br />officials as may appear appropriate in the circumstance <br />the case shall review the impact study to analyze its <br />adequacy in solving any traffic problems that will occu <br />due to the uses allowed by the proposed zoning. The Bo <br />of Commissioners shall consider the impact study and th <br />[] = delete text <br />bold underline = add text <br />C•14 <br />e <br />of <br />
The URL can be used to link to this page
Your browser does not support the video tag.