Browse
Search
Agenda - 05-15-1990 (2)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 05-15-1990 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:27:48 PM
Creation date
11/1/2017 12:13:24 PM
Metadata
Fields
Template:
BOCC
Date
5/15/1990
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
532
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13.4 <br />� 58 <br />U <br />Special Use Permit: estimated traffic generated by <br />the permit exceeds 800 trips /day or 100 trigs during--the <br />AM or PM eak -hour of highway traffic. <br />Site Plan: estimated traffic generated by the development <br />exceeds 800 trips /day or 100 tri s during he AM or PM <br />Beak- hour__of_ highway traffic. <br />(The proposed amendments incorporate a peak -hour threshol <br />to cover uses that generate a high proportion of their trips <br />during the peak hour). <br />Zoning changes, special use permits, or site plans that <br />produce more than 800 trips per day or 100 trips during the <br />or PM peak-hour of highway traffic may be exempted from the <br />requirements to prepare and submit a traffic impact study . if <br />in land use or densit that would increase travel and no <br />change in access to the external street s stem. [material is <br />submitted to demonstrate that traffic created by the proposal <br />when adding to existing traffic will not result in a need for <br />transportation improvements.] Planning Department staff will <br />review material submitted in support of an exemption and will <br />determine from that material whether or not to grant the <br />exemption. If an exemption is granted, documentation of the <br />exemption will be submitted as part of the staff recommendati n. <br />(The proposed amendment identifies criteria under which a <br />proposed development may be exempted from TIS requirements). <br />Orange County may require any zoning change, special use permit, <br />or site plan application to be accompanied by a traffic impact <br />study when a road capacity or safety issue exists. If one is <br />required, the County will notify the applicant of the reason for <br />the requirement. <br />that would increase traffic or change access <br />General Re uirements and Standards <br />The traffic impact study shall contain the following <br />information: <br />a) General Site Description <br />The site description shall include the size, location, <br />proposed land uses, number of units and gross square <br />footage by land use existing_lang use a d zoning, <br />construction staging and completion date of the propos <br />land development to the exten t known or ble to be <br />[] = delete text <br />bold underline = add text <br />
The URL can be used to link to this page
Your browser does not support the video tag.