Browse
Search
Agenda - 05-15-1990 (2)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 05-15-1990 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:27:48 PM
Creation date
11/1/2017 12:13:24 PM
Metadata
Fields
Template:
BOCC
Date
5/15/1990
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
532
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Motion was made by Commissioner Marshall, seconded by Commissioner <br />Halkiotis to refer this item to the Planning Board for a recommendation <br />to be presented to the Board of <br />Commissioners no sooner than August 6, 1990. <br />VOTE: UNANIMOUS <br />B. ORANGE COUNTY THOROUGHFARE PLAN <br />The existing Hillsborough Thoroughfare Plan and applicable <br />portions of the proposed thoroughfare plans for the Durham - Chapel <br />Hill - Carrboro urban area and Alamance County urban Area have been merged <br />with a County - specific road classification system for the rural areas of <br />the County. The Transportation Advisory subcommittee (TAS) expressed a <br />concern about the plan as it relates to the Hillsborough plan. To <br />alleviate the traffic.congestion on Churton Road, it is proposed that <br />Elizabeth Brady Road Extension connect with St. Mary's Road. The TAS <br />identified several concerns with this proposal. The Eno River and its <br />floodplains cross this proposed road and a bridge would need to be <br />built. Also, the proposed road would come very close to some historic <br />properties as well as several established homes in that area. <br />The western bypass that extends from Coleman Loop Road to <br />U.S. 70 was another concern expressed by the TAS. The primary <br />consideration was potential water quality impacts on the upper Eno <br />Watershed. <br />The work done by Kimley Horn and Associates, the State and <br />the Town do not match up. The TAS requested that the classification be <br />consistent from one jurisdictional line to the next. Two concerns were <br />expressed about the Efland Interchange and I -85 widening on which the <br />Commissioners passed a resolution in March. Gene Bell mentioned that <br />there is some inconsistency in the Hillsborough Thoroughfare Plan as it <br />relates to Davis Road. Mr. Norwood from DOT stated that the section <br />from Orange Grove Road to Old 86 would be two lanes within a 100 -foot <br />right -of -way. The section from Old 86 to New 86 would eventually be <br />three lanes. <br />With reference to the Durham - Chapel Hill- Carrboro (DCHC) <br />plan, Gene Bell explained that the plan is based on existing land use <br />patterns and existing and future traffic flow. On this item the <br />Planning Staff recommended: <br />1) The adoption of the Orange County functional road <br />classification; <br />2) The adoption of the DCHC Plan following Chapel Hill <br />adoption, provided that the Outer Loop is removed in its <br />entirety and there is a consistent classification applied <br />to Dairyland Road; <br />3) The adoption of the Hillsborough Plan, provided that, <br />there is a re- assessment of the need for the Western By- <br />Pass. that there is a consistent classification applied <br />to High Rock Road, and a recognition of the County <br />Commissioners resolution of March 5, 1990 concerning best <br />management practices and continued access under I -85 as <br />part of the programed improvements for I -85; and <br />4) The adoption of the Alamance County Urban Area Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.