Browse
Search
Agenda - 05-15-1990 (2)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 05-15-1990 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:27:48 PM
Creation date
11/1/2017 12:13:24 PM
Metadata
Fields
Template:
BOCC
Date
5/15/1990
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
532
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for average weekday traffic, the peak highway hour(s) and. if <br />appropriate. peak development- generated hour(s) for all roadways and <br />major intersections in the study area. Volume /capacity calculations <br />shall be completed for all major intersections. It is usually at these <br />locations that capacity is most restricted. <br />All access points and pedestrian crossings shall be examined fir <br />a¢agaAtg_ sight distance and [as to the feasibility of] f he ne essit <br />of installing traffic signals. [This] The traffic signal evaluation shall <br />compare the projected traffic and pedestrian volumes to the warrants <br />for traffic signal installation. <br />f. Conclusions and Recommended Improvements <br />Levels -of- service for all roadways and signalized intersections rse ving <br />10 percent or more of peak -hour prolect traffic shall be reported. All <br />roadways and /or signalized intersections showing a level of service <br />below D in urban or developed areas or below C in rural areas shall <br />be considered deficient, and specific recommendations for the <br />elimination of these problems shall be listed. This listing of <br />recommended improvements shall include, but not be limited to the <br />following elements: internal circulation design, site access location <br />and design, external roadway and intersection design and <br />improvements, traffic signal installation and operation including signal <br />timing, and transit service [design] improvements. All physical <br />roadway improvements shall be shown in sketches. <br />[The listing of recommended improvements for road improvements shall <br />include for each improvement, the party responsible for the <br />improvement, the cost and funding of the improvement, and the <br />completion date for the improvement.] <br />[] = delete text 43 <br />bILId = add text <br />
The URL can be used to link to this page
Your browser does not support the video tag.