Orange County NC Website
i <br />the r 1 n . Vehicular trip generation rates to be used for this <br />calculation shall be obtained from an accepted source such as [the <br />Transportation and Traffic Engineering Handbook, the Institute of <br />Transportation Engineers] "Trip Generation" (InjjitMte of <br />Transportation Engineers Fourth Edition. 1997 as amended). These <br />development- generated traffic, movements as estimated, and the <br />reference source(s) and methodology followed shall be documented. <br />[All turning movements shall be calculated.] These generated volumes <br />shall be distributed to the study area and assigned to the existing <br />roadways and intersections throughout the study area. Documentation <br />of all assumptions used in the distribution and assignment phase shall <br />be provided. All average daily traffic link volumes within the study <br />area shall be shown graiphically, Peak hour turning movement volumes <br />shall be shown for signalized and other ma3or_interaections. jnglaft <br />all access points to the development. [Traffic volumes shall be <br />assigned to individual access points.] Pedestrian- r l m h <br />crossings and as otherwise applicable shall be rgpgrjgd, [Pedestrian <br />volumes shall also be calculated, if applicable. If school crossings are <br />to be used, pedestrian volumes shall be assigned to each crossing.] <br />Any characteristics of the site that will cause [particular] trip <br />generation [problems shall be noted] to vary_ significantly from average <br />rates available in published sources shall be documgnted, i s uAJm <br />such faCt-ors as diversion of gasser-by, traffic. internal capjure, <br />staggilred work hours. r ult of transil. <br />e. Anillysis of TEinsportation Impact <br />The total traffic demand that will result from construction of the <br />proposed development shall be calculated. This demand shall consist <br />of the combination of existing traffic, traffic generated by the <br />proposed development, and traffic due to other developmentg find other <br />growth-j growth-jq traffic that would be expected to use the roadway at _the <br />ime the prgpased vel m n i m If staging of the <br />proposed development is anticipated, calculations for each stage of <br />completion shall be made. This analysis shall be performed [during] <br />[] = delete text 42 <br />bold = add text <br />