Browse
Search
Agenda - 05-15-1990 (2)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 05-15-1990 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:27:48 PM
Creation date
11/1/2017 12:13:24 PM
Metadata
Fields
Template:
BOCC
Date
5/15/1990
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
532
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />The report shall describe the entire external roadway system within <br />the study area. Major intersections or intersections in the study area <br />and all intersections gr driveways adjacent to or within 400 feet of <br />the site shall be identified and sketched. All existing and proposed <br />public transportation services and facilities within one mile of the site <br />shall also be documented. Future highway improvements, including <br />proposed construction and traffic signalization, shall be noted. This <br />information shall be obtained from North Carolina's Transportation <br />Improvement Program. Any proposed roadway improvements due to <br />proposed surrounding developments shall also be noted. <br />c. Existiny Traffic Conditions <br />Existing traffic conditions shall be [measured and] documented for all <br />roadways and intersections in the study area. Existing traffic volumes <br />for average daily traffic, peak highway hour(s) traffic, and peak <br />development - generated hour(s) traffic, If_ appropriate, shall be <br />recorded. Manual traffic counts at major intersections in the study <br />area shall be conducted, encompassing the peak highway and <br />development - generated hour(s), if appropriate, and documentation shall <br />be included in the report. Existing average daily or peak -hour trafflS <br />counts made within one year of the study date may be used subject to <br />Planning De artment r val. A volume /capacity analysis based upon <br />existing volumes shall be performed during the peak highway hour(s) <br />and the peak development- generated hour(s), if_ appropriate, for all <br />roadways and major intersections expected _ to LJmpacted by <br />development traffic. Levels of services shall be determined for each <br />[location] signalized intersection or roadway segment analyzed above. <br />d. Transportation lmuact of the Develoomgnt <br />Estimation of vehicle trips to result from the [proposal] proposed <br />development shall be completed for the average weekday, the average <br />daily AM and PM peak hours of highway IrgIll in the,ftudy area, and, <br />if apBropjiate, the peak [development- generated] hour of generation by <br />[] = delete text <br />bold = add text <br />41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.