Browse
Search
Agenda - 05-15-1990 (2)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 05-15-1990 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:27:48 PM
Creation date
11/1/2017 12:13:24 PM
Metadata
Fields
Template:
BOCC
Date
5/15/1990
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
532
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
13.3 Applicability <br />Except as described below, a traffic impact study shall be required for all <br />zoning changes, special use permits, or site plans that meet the following <br />criteria: <br />Zoning Changes: estimated average traffic generated <br />by uses permitted in the zone being applied for <br />exceed 800 trips /day or 100 trigs during.1he M ja <br />PM peak -hoer of highway t <br />Special Use Permit: estimated traffic generated by <br />the permit exceeds 800 trips /day or 100 trips during <br />the AM or PM peak -hour of highway traffic, <br />Site Plan: estimated traffic generated by the <br />development exceeds 800 trips /day or 1 0 trips during <br />t,,,ll g-AM or PM peak -hour of highway trai#Ic. <br />Zoning changes, special use permits, or site plans that produce more than <br />800 trips per day may be exempted from the requirements to prepare and <br />submit a traffic impact study if a traffic Impacl ltudy has r vi 1 n <br />RreRared and there is. to hj no hap e 1pland use density that uld <br />in r travel and no h n In h xt rnal street <br />systm.[material is submitted to demonstrate that traffic created by the <br />proposal when adding to existing traffic will not result in a need for <br />transportation improvements.] Planning Department staff will review <br />material submitted in support of an exemption and will determine from that <br />material whether or not to grant the exception. If an exemption is <br />granted, documentation of the exemption will be submitted as part of the <br />staff recommendation. <br />Orange County may require any zoning change, special use permit, or site. <br />plan application to be accompanied by a traffic impact study when a road <br />capacity or safety issue exists. If one is required, the County will notify <br />the applicant of the reason for the requirement. <br />[] - delete text 39 <br />b41¢ - add text <br />
The URL can be used to link to this page
Your browser does not support the video tag.