Orange County NC Website
COPY -N000T <br />to a multi-lane facility. Construction to start in 1996. <br />5) U -624: NC 86 (South Columbia Street), US 15 -501 bypass <br />to Manning Drive, widen existing roadway to a five lane <br />facility. Construction to start in 1993. <br />Bridge Projects <br />1) B -2598: North Fork Little River, replace Bridge No. 54 <br />on NC 157. Completion 1995 <br />2) B -2100: Bridge No. 101, along SR 1005; Alamance- Orange <br />Counties; replacement of bridge over Haw River; scheduled <br />for completion after 1994. <br />3) B -2599: Eno River, replace Bridge No. 185 on SR 1148. <br />Completion 1993. <br />4) B -2157: Morgan Creek, replace Bridge No. 88 on SR 1919. <br />Completion 1991. <br />34 <br />