Orange County NC Website
3 <br />TABLE 5 (cont.) <br />HILLSBOROUGH THOROUGHFARE STUDY <br />CONSTRUCTION PROJECTS AND PRIORITIES FOR THE HILLSBOROUGH PLANNING AREA <br />PROJECT <br />LENGTH <br />TYPE OF <br />CROSS- SECTION <br />RIGHT -OF -WAY <br />1987 EST. COST <br />(From -to) <br />(mi) <br />IMPROVEMENT <br />EXIST. PROP, <br />EXIST. PROP. <br />(Divided by $1000) <br />THIRD <br />PRIORITY PROJECTS <br />LAWRENCE RD. <br />(EOP - SR1710) <br />2.14 <br />WIDEN <br />20 36 <br />60 100 <br />$ 1,305 <br />ST. MARY'S RD. <br />(LAWRENCE EXT.- <br />(. PLAN. BDRY.) <br />3.21 <br />WIDEN <br />16 -18 2x24 <br />60 150 <br />$ 7,856 <br />MILLER RD. EXT. <br />(SR1555-- N.SIDE) <br />0.19 <br />NEW <br />NA 24 <br />NA 60 <br />$ 182 <br />(SR1588 -.92mi N) <br />0.92 <br />PAVE <br />26 24 <br />60 60 <br />$ 460 <br />SHAWNEE DR. <br />(NC86 -WSTRN BYP) <br />0.90 <br />NEW <br />NA 24 <br />NA 60 <br />$ 861 <br />KING STREET EXT. <br />(SR1150- SR1206) <br />0.19 <br />NEW <br />NA 24 <br />NA 60 <br />$ 182 <br />WEST TEN RD. <br />(SR1144W- SR1120) <br />1.23 <br />RELOCATE <br />NA 36 <br />NA 100 <br />$ 1,454 <br />NEW HOPE CH. RD. <br />(I40 - NC86) <br />0.64 <br />WIDEN <br />24 64 <br />60 100 <br />$ 765 <br />(SR1723 INTRSCT- <br />W/SR1710) <br />0.38 <br />REALIGN INT <br />18 -20 24 <br />NA 60 <br />$ 363 <br />DAVIS RD. EXT. <br />(SR1009 -NC86) <br />1.07 <br />NEW <br />NA 36 <br />NA 100 <br />$ 1,329 <br />(64) <br />($ 535) <br />NOTE: VALUES IN () ARE FOR ULTIMATE PROJECTS AND THE TOTALS OF THESE ARE NOT <br />INCLUDED IN THE SUMMATION OF COSTS FOR IMPLEMENTATION OF THE <br />HILLSBOROUGH THOROUGHFARE PLAN. <br />49 <br />