Orange County NC Website
TABLE 5 (cont.) <br />HILLSBOROUGH THOROUGHFARE STUDY <br />CONSTRUCTION PROJECTS AND PRIORITIES FOR THE HILLSBOROUGH PLANNING AREA <br />PROJECT <br />LENGTH <br />TYPE OF <br />CROSS - SECTION <br />RIGHT -OF -WAY <br />1987 EST. COST <br />(From -to) <br />(mi) <br />IMPROVEMENT <br />EXIST. PROP. <br />EXIST. PROP. <br />(Divided by $1000) <br />* * * * * * * * * * * * * <br />* * * * * * * <br />* * * * ** SECOND <br />PRIORITY PROJECTS <br />* * * * * * * * * <br />* * * * * * * * * * * * * ** <br />OAKDALE DR. EXT. <br />(NC86 - SR1009) <br />1.35 <br />NEW <br />NA 36 <br />NA 60 <br />$ 1,546 <br />BALDWIN RD. <br />(N.SIDE -0.1mi S) <br />0.25 <br />PAVE <br />28 24 <br />60 60 <br />$ 125 <br />(64) <br />(100) <br />($ 287) <br />(.25mi S- EXIST.) <br />0.62 <br />NEW <br />NA 24 <br />NA 60 <br />$ 638 <br />(64) <br />(100) <br />($ 668) <br />(EXIST.- SR1561) <br />0.34 <br />PAVE <br />28 24 <br />60 60 <br />$ 170 <br />(64) <br />(100) <br />($ 391) <br />SHAWNEE DR. <br />(NC86 - NC57) <br />0.21 <br />PAVE <br />34 24 <br />60 60 <br />$ 105 <br />(NC57 - SR1587) <br />0.16 <br />NEW <br />NA 24 <br />NA 60 <br />$ 154 <br />KENION RD. <br />(SR1332- SR1335) <br />0.23 <br />NEW <br />NA 36 <br />NA 60 <br />$ 255 <br />(SR1335) <br />1.19 <br />PAVE <br />18 24 <br />NA 60 <br />$ 595 <br />(SR1335 - NC86) <br />0.28 <br />NEW <br />NA 36 <br />NA 60 <br />$ 310 <br />PHELPS RD. <br />(SR1551 - NC57) <br />0.34 <br />NEW <br />NA 36 <br />NA 60 <br />$ 377 <br />* * * * * * * * * * * * * <br />* * * * * * * * <br />* * * ** THIRD <br />PRIORITY PROJECTS <br />* * * * * * * * * * <br />* * * * * * * * * * * * * ** <br />NC86 <br />(SR 1894 - <br />S. PLAN. BDRY.) <br />2.44 <br />WIDEN <br />22 64 <br />100 100 <br />$ 2,628 <br />INORTHSIDE DR. <br />(SR1002- SR1538) <br />0.66 <br />NEW <br />NA 24 <br />NA 150 <br />$ 1,104 <br />(2x24) <br />($ 462) <br />(SR1538- SR1554) <br />0.74 <br />NEW <br />NA 24 <br />NA 150 <br />$ 1,237 <br />(2x24) <br />($ 518) <br />(SR1554 - NC57) <br />1.77 <br />NEW <br />NA 24 <br />NA 150 <br />$ 2,961 <br />(2x24) <br />($ 1,239) <br />NOTE: VALUES IN () ARE FOR ULTIMATE PROJECTS AND THE TOTALS OF THESE ARE NOT <br />INCLUDED IN THE SUMMATION OF COSTS FOR IMPLEMENTATION OF THE <br />HILLSBOROUGH THOROUGHFARE PLAN. <br />48 <br />