Browse
Search
Agenda - 05-15-1990 (2)
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 05-15-1990 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:27:48 PM
Creation date
11/1/2017 12:13:24 PM
Metadata
Fields
Template:
BOCC
Date
5/15/1990
Meeting Type
Public Hearing
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
532
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VIII. CONSTRUCTION PRIORITIES <br />STAGED CONSTRUCTION <br />Several recommendations on the proposed plan (Table 5) call <br />for staged construction parentheses)gbeingltherultimateve- <br />ment and phase two (d enoted <br />erim <br />improvement. When sta to constructin is twentytyear <br />improvement is considered <br />planning period provided the proposed improvements are fully <br />implemented. <br />When an ultimate four -lane median - divided section is <br />recommended for staged construction (e.g., Western Bypass and <br />Northside Drive), the proposed interim section will be two lanes <br />offset on the right -of -way to facilitate the construction of the <br />median and the other two lanes at a later date. The outside <br />shoulders would be graded to allow for a third lane in each <br />direction if curb and gutter were to be installed. Similarly, <br />several roads are proposed to be improved to three -lane sections <br />with shoulders graded to allow expansion to five lanes with curb <br />and gutter, sidewalks and utility easements, when warranted, at a <br />future date. Use of curaoutsideeshoulders maintenance <br />right -of -way needs because <br />are not needed; however, construction costs and storm water runoff <br />rates are increased. <br />PRIORITIES <br />Table 5 lists improvements to the proposed plan in five <br />categories. These are listed as currently programed projects that <br />are either underway or scheduled for construction and also un- <br />programed improvements which are recommended for funding.prihe <br />unmet needs are divided into four priority groups. Each <br />represents a five -year increment with first priority beginning in <br />1990. <br />PROGRAMED IMPROVEMENTS <br />The programed projects include the widening of I -85 from four The <br />to six or eight lanes (ShRoadeaSR 114892a1so•referredvtogasnd <br />upgrading of Eno Mountain <br />Allison Street) by the developer of the Hillsborough Business of <br />cost <br />Center is also shown as a Ps °gsestimated toebe.$ 126x6 Million. <br />these programed improvements <br />