Orange County NC Website
w 9 <br />4 <br />way in writing-to the planning-and Ins ections <br />De artment. <br />[9. Schedule final inspection with Planning Department <br />staff.] <br />[10. Certification and approval of private road by <br />Planning Department staff.] <br />[11]10. Record final subdivision plat with Register of Deeds. <br />(The proposed amendments are in concert with the <br />amendments proposed above making it possible for a <br />professional engineer or registered land surveyor to <br />inspect and certify private road construction). <br />GENERAL CONSTRUCTION SE UENCE <br />[Contact Planning Department before beginning <br />construction so inspections can be scheduled.] Remove all <br />trees, stumps, roots, and other vegetation from the width of <br />right -of -way necessary to construct the road to the required <br />dimensions. Fill and compact all depressions created by <br />clearing. <br />Build roadbed to required dimensions, raQ des,_ cutting, <br />filling and [compacting] con acted to 9Q relative drX <br />density. Standard Proctor Methodl as determined b <br />groofrolling observed b the certif in rofessional or b <br />actual soil com action tests if re aired b the certif in <br />rofessional or the County. [where necessary for a desirable <br />grade.] <br />(The proposed amendment proposes more stringent standards for <br />roadbed construction). <br />Install culverts to provide cross drainage. <br />Construct side ditches and crown travelway. <br />Place and compact 4" of surface material. <br />Seed and mulch disturbed areas in order to stabilize. <br />Install standard road name sign. <br />Have final inspection and written certification by <br />[Planning Department] certifying r fession 1. <br />[i = delete text <br />bold underline = add text <br />