Browse
Search
Agenda - 04-17-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 04-17-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:11:30 PM
Creation date
11/1/2017 12:04:19 PM
Metadata
Fields
Template:
BOCC
Date
4/17/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attach 10 40 <br />(4). A permit may be issued where the distance between the <br />construction site electrical service and any interior point at <br />floor level is in excess of 200 feet following the most direct <br />route than an extension cord could reasonably be routed. <br />(b) (1) If an Inspector determines that an applicant for <br />temporary electric power has not met the requirements of Section <br />5(a) above, the Inspector shall deny the permit and return a copy <br />of the application to the applicant, indicating the reasons for the <br />denial. <br />(2) If an Inspector determines that an applicant for <br />temporary electric power has met the requirements outlined in <br />Section.5(a) above, the Inspector shall indicate such on the <br />application, sign the application and transmit the application to <br />the Director. The Director shall grant a permit if he finds that <br />the applicant intends to use temporary electric power for testing <br />and verification of systems in the building or for a purpose <br />authorized in 5(a) above. The Director shall deny*the permit <br />application if he decides that the applicant seeks temporary power <br />for any other reason. <br />(c) The Director's or Inspector's decision to approve or deny <br />an application,_for temporary electric power is final. <br />Sec. 6. Other Conditions on Permits. The following conditions <br />are in effect on all temporary electric power permits issued by <br />the Director: <br />H <br />
The URL can be used to link to this page
Your browser does not support the video tag.