Orange County NC Website
A <br />Attach 10 39 <br />ARTICLE II - Application-and Permittin Procedures <br />Sec. 4. Application. Any person desiring a permit for temporary <br />electric power shall apply for same in writing on the form provided <br />by the Department. The application shall be signed by the general <br />and the electric contractors, the mechanical contractor, if any, <br />and the owner of the property in question. The applicant shall <br />indicate which systems are to be energized and shall present <br />written evidence of the suitability of such systems to be operated. <br />Sec.. 5. Standards for Permit Issuance. (a) The application for <br />temporary electric power shall be reviewed by an Inspector, who <br />shall determine that each of the following requirements is met: <br />(1) No permit for temporary electric power shall be issued <br />until the building has passed a final electrical inspection. <br />(2 ) When the building in question is a mobile home, temporary <br />electric power may be used only for construction of steps, porches <br />or decks, and only then if saw service is unavailable. No <br />temporary electric power shall be provided to mobile homes in <br />mobile home parks. <br />(3) If the application for temporary electric power indicates <br />such power is to be used for heating, ventilation and air <br />conditioning systems, a permit may hp ffra„tAA t„ <br />environmental conditions necessary to facilitate the installation <br />of environmentally sensitive materials, or finishes in accordance <br />with the manufacturer's instructions. <br />3 <br />