Browse
Search
Agenda - 04-17-1990
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
1990's
>
1990
>
Agenda - 04-17-1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2017 12:11:30 PM
Creation date
11/1/2017 12:04:19 PM
Metadata
Fields
Template:
BOCC
Date
4/17/1990
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
304
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Planning Department shall also consider the general <br />suitability of the land for development to avoid <br />unnecessary expense in the redesign of acceptable <br />subdivision proposals. The Planning Department <br />shall review the proposal for compatibility with <br />the Orange County Comprehensive Plan and, in <br />particular, determine if proposed sites for schools <br />and other public /private facilities are to be <br />reserved and /or provided. <br />W.L- ,n fn= 4Ws- 44.54 The Plannina De artment <br />shall com lete its review of the Concept Plan <br />within twenty -one (21� days of the date of <br />acceptance of the Concept Plan or within such <br />further time consented to in writing by the <br />applicant. The Planning Department shall submit to <br />the Planning Board a written analysis of the <br />Concept Plan and its recommendation at the first <br />regularly scheduled meeting of the Planning Board <br />followina the expiration of the 21-day period. If <br />the Planning Department fails to prepare a report <br />to the Planning Board within the specified time <br />period, or extension thereof, the Concept Plan is <br />recommended without conditions. <br />ORDINANCE REVIEW SUBCOMMITTEE: 12/20/89 <br />The Ordinance Review Committee acknowledged the problem with <br />the existing time limits and recommended approval of the <br />amendment. <br />PLANNING BOARD REVIEW: 3/19/90 <br />The Planning Board recommended approval of the amendment as <br />revised to allow 21 days for review of the project and for <br />preparation for the Planning Board meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.