Orange County NC Website
18 <br /> 00000 00100 100 11111111 <br /> u. 111111111 <br /> un:11111 11111111111111111111111 rim <br /> minutes, conduct monthly and preconstruction meetings and report all info to the owner and the <br /> contractor to insure that they are in keeping with the construction documentation. The architect <br /> anticipates that the Owner will provide assistance with RFI's and site visits. The architect anticipates <br /> a twelve month construction period. If the construction period should exceed this time frame, the <br /> Architect shall provide additional construction administration services as an additional service, upon <br /> written approval by the Owner. <br /> DESIGN FEE: <br /> For full Architectural Design Services, compensation shall be based on a fixed fee of Eight hundred <br /> and Eight hundred and five thousand dollars ($805,000) based on an overall project budget of <br /> approximately nine million one hundred and eighty-five thousand dollars ($9,185,000). <br /> FEE SCHEDULE: <br /> The Design Fee shall be billed based on the following percentages with timeframes as outlined in <br /> Owner's contract documentation: <br /> Phase 1 % Time Amount <br /> Schematic Design 25% 3 months $ 93,385 <br /> Design Development 15% 1 month $ 56,031 <br /> Construction Documents 35% 6 months $130,739 <br /> Bid Administration 5% 2 months $ 18,677 <br /> Construction Administration 20% 12 months $ 74,708 <br /> 100% 24 months $373,540 <br /> Phase 2 % Time Amount <br /> Schematic Design 25% 3 months $114,000 <br /> Design Development 15% 1 month $ 68,400 <br /> Construction Documents 35% 8 months $159,600 <br /> Bid Administration 5% 2 months $ 22,800 <br /> Construction Administration 20% 12 months $ 91,200 <br /> 100% 24 months $456,000 <br /> Total Fee $829,540 <br /> Contingency $ 60,000 <br /> Grand Total $889,540 <br /> The Architect will carry an additional contingency in the amount of sixty thousand dollars ($ 60,000) <br /> for possible unforeseen conditions requiring additional design work. This work will not commence <br /> until both parties agree in writing to the change in work and the compensation amount, based on <br /> established hourly rates. When a definitive start date is established, we will provide a more detailed <br /> schedule. Phase 1 and 2 design work will commence concurrently and the construction for Phase 2 <br /> will begin directly after Phase 1 construction is completed, or in a timeframe determined by the <br /> Owner. The total project schedule is a not to exceed forty-eight month schedule. <br /> 4600 I.....alke Boone .i iralili, Suite 205 IRalieli€ Ih, NC 27607 919.781.8582 II...IUB Certified <br /> www.r,::,inrli't� (,:'Aliinnett.cc:ainr <br />