Orange County NC Website
14 <br /> 00000 00100 100 11111111 <br /> 11111 un:11111 11111111111111111111111 rim <br /> A C -I ...... . . . <br /> October 2, 2017 <br /> Orange County <br /> 200 South Cameron Street <br /> Hillsborough, North Carolina 27278 <br /> Attn.: Mr. Jeff Thompson <br /> Director of Asset Management Services <br /> Dear Mr. Thompson: <br /> FEE PROPOSAL: Orange County Southern Campus Expansion <br /> Smith Sinnett Architecture greatly appreciates the opportunity to provide Orange County with a <br /> proposal for Architectural Design & Engineering Services for the Orange County Southern Campus <br /> Expansion. <br /> SCOPE OF WORK: <br /> The project consists of two phases. The first phase will include the following: a master plan for a future <br /> 12,000 square foot addition to the Seymour Center. The initial portion will be an approximately 2500 <br /> square feet addition. Additional work will include reworking the front entry sidewalk into an accessible <br /> entry area, the creation of a new canopy and the parking lot will be reconfigured for improved <br /> bus/vehicle drop off. The site work will include the relocation of the existing storm water pond located <br /> near the entrance driveway, the realignment of the entrance roadway to remove some of the curvature, <br /> the expansion of the existing parking lot supporting the Seymour Center and the extension of a 10'wide <br /> multi-purpose pathway from the Inter-Faith Council Project Home Start driveway to the eastern parcel <br /> property line. <br /> It is anticipated as a part of the overall design process, that we will hold meetings with the client and <br /> their stakeholders as needed. We will propose that several of these meetings occur in Smith Sinnett's <br /> office. Additionally, we will meet with the county commissioners at the end of each phase for their <br /> approval prior to commencing the next phase. We will also meet with the Town of Chapel Hill as needed <br /> to achieve all necessary approvals. We will provide professional cost estimating at the conclusion of <br /> the design development and construction document phase in order to stay within budget throughout <br /> the life of the project. This cost, along with all engineering fees is included within our overall fee. <br /> We anticipate that the design team and the owner will work creatively to insure best practices, <br /> efficiencies and cost adherence in the proposed scope of each project. We will discuss possibilities for <br /> altering the timing of the separate scopes should it be deemed more cost effective to provide all of the <br /> site/civil work in the first phase and all of the building portions of the project into the second phase. <br /> Programming/Schematic Design (Phase 1): <br /> Smith Sinnett Architecture will work with and coordinate all members of the design team to evaluate <br /> the owner's master plan and begin developing an approach to design and construction of the proposed <br /> improvements that will minimize impact to the function of the existing campus. During the <br /> 4600 I.....alke Boone .i iralill, Suulite 205 Ralleliglh, NC 27607 919.X81.8582 IL..IUB Ceirtrffed <br /> www.S n'ilth Sli ininett.coin m <br />