Orange County NC Website
6 <br /> 4 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> 9 <br /> 10 <br /> 11 <br /> 12 <br /> Total Commodities Cost: <br /> •ther Direct Costs <br /> # Equipment Quantity Cap Amount Cost <br /> 1 Equipment Trailer-Includes striping and shipping 1. $5,000.00 $5,000.00 <br /> 2 Set of(3) Checkpoint Signs with Stands 4 $1,200.00 $4,800.00 <br /> 3 Traffic Cones w/reflective stripping 100 $35.00 $3,500.00 <br /> 4 Other: DWI Simulator 1 $23,000.00 $23,000.00 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> Total Equipment Cost $36,300.00 <br /> # Other Items and Equipment Direct Cost Cost <br /> 1 5 Alco-Sensors $2,500.00 <br /> 2 <br /> 3 <br /> 4 <br /> 5 <br /> 6 <br /> 7 <br /> 8 <br /> Total Other Items and Equipment Direct Cost: $2,500.00 <br /> # Travel Cost <br /> 1 In-State Travel $1,500.00 <br /> 2 Out-of-State Travel $2,700.00 <br /> Total Travel Cost: $4,200.00 <br /> Total Other Direct Costs: $43,000.00 <br /> ndirect Costs <br /> # Indirect Costs Cost <br /> 2 <br /> 3 <br /> 4 <br /> Total Indirect Costs <br /> Version 1.0 Page 4 of 6 <br />