Browse
Search
Agenda - 10-17-2017 - 8-a - Minutes
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 10-17-2017 - Regular Mtg.
>
Agenda - 10-17-2017 - 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/12/2017 3:44:27 PM
Creation date
11/1/2017 10:16:53 AM
Metadata
Fields
Template:
BOCC
Date
10/17/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8a
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
12 <br /> 1 - Lists highway, transit and other transportation projects to address future transportation <br /> 2 deficiencies through year 2045. <br /> 3 - Assumptions — based on future land use, population and employment. <br /> 4 - Fiscal Constraint—Anticipated revenues must cover anticipated project costs. <br /> 5 - Funding -- Projects must be in MTP to receive state and federal funding (via <br /> 6 Transportation Improvement Program —TIP) <br /> 7 - Used for Planning <br /> 8 e.g., In development review, use LRTP to reserve right-of-way for future highway and <br /> 9 fixed guide way projects <br /> 10 <br /> 11 What is the 2045 (MTP) Process <br /> 12 1. Goals and Objectives <br /> 13 2. Socioeconomic Data (population and employment forecasts) <br /> 14 3. Deficiency Analysis <br /> 15 4. Alternatives Analysis- We Are Here! <br /> 16 5. Preferred Option- Oct. Dec 2017 <br /> 17 6. Final MTP- Dec. 2017 <br /> 18 <br /> 19 What is the Alternatives Analysis? <br /> 20 - A combination of a transportation network, which includes a set of highway, transit <br /> 21 and other transportation improvements, and a land use scenario that depicts the <br /> 22 distribution of population and employment (2045). <br /> 23 - Alternatives run in the Triangle Regional Model (TRM) to produce metrics that <br /> 24 describe how well Alternatives meet future travel demand. <br /> 25 - Final 2045 MTP expected to be a combination of projects and policies from the <br /> 26 various Alternatives. <br /> 27 <br /> 28 What are the Alternatives? <br /> 29 *2045 Land Use Scenario + Transportation Network=Alternative <br /> 30 <br /> 31 Land Use--SE Data Guide Totals* Chart <br /> 32 <br /> 33 What Information is Available? <br /> 34 -Triangle Regional Model Output <br /> 35 • Performance Measures <br /> 36 • Travel lsochrones <br /> 37 • Travel Time <br /> 38 • Congestion Maps (V/C) <br /> 39 • <br /> 40 2045 No-Build —Congestion Map <br /> 41 <br /> 42 Key Conclusions from Alternatives Analysis <br /> 43 Demographics <br /> 44 • Orange County will continue to experience population and employment growth <br /> 45 • Orange County employers will continue to attract commuters from outlying counties <br /> 46 <br /> 47 Congestion <br /> 48 • Alternatives show significant improvements in travel time over the no-build scenario <br /> 49 • Travel times will increase even with roadway improvements that are beyond the budget <br /> 50 Rail and Land Use <br />
The URL can be used to link to this page
Your browser does not support the video tag.