Browse
Search
Agenda - 09-19-2017 - 7-a - Mountains to Sea Trail – Report on Segment 11 Trail Planning
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 09-19-2017 - Regular Mtg.
>
Agenda - 09-19-2017 - 7-a - Mountains to Sea Trail – Report on Segment 11 Trail Planning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/14/2017 4:33:30 PM
Creation date
11/1/2017 10:16:08 AM
Metadata
Fields
Template:
BOCC
Date
9/19/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7a
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
23 <br /> Conditions for Mountains-to-Sea Trail on OWASA Land <br /> August 19, 2016 <br /> Page 6 <br /> 9. The County shall secure easements from private land owners adjacent to <br /> the trail endpoints on OWASA land prior to opening the trail on OWASA <br /> land. <br /> 10. No unauthorized removal of natural or cultural resources. <br /> No Expenditure of OWASA funds <br /> This condition meets the third requirement of OWASA Board of Directors' <br /> December 2009 letter supporting the use of OWASA land for the MST. <br /> 1. Consistent with its obligations and requirements, OWASA will not spend <br /> any funds for trail planning, design, construction, operation and <br /> maintenance, including the monitoring and enforcement of applicable <br /> requirements and regulations. <br /> 4.17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.