Orange County NC Website
ORANGE COUNTY FUEL AND ENERGY CONSUMPTION SUMMARY <br /> FUEL USE <br /> GASOLINE <br /> USAGE(GALLONS) VARIANCE <br /> 2005 2006 MAY YTD TOTAL <br /> MAY I YTD TTL MAY I YTD TTL CITY % CITY <br /> 20,615 102,508 17,377 93,608 -3,238 -15.71 -8,899 -8.68 <br /> DIESEL <br /> USAGE(GALLONS) VARIANCE <br /> 2005 1 2006 MAY YTD TOTAL <br /> MAY I YTD TTL I MAY I YTD TTL CITY % I QTY <br /> 4,161 19,692 3,515 20,401 -646 -15.53 709 3.60 <br /> NOTES: <br /> This report identifies fuel used for the operation of County vehicles and equipment. It does not <br /> include fuel used by the Town of Hillsborough, or outside agencies(ABC,Orange Enterprises,etc.) <br /> (1) Animal Shelter vehicles typically fuel off-site(Town of Chapel Hill) <br /> (2) Central Services no longer provides mail/courier service <br /> (3) Use of diesel fuel by OPT began with diesel vehicle on new Chapel Hill route in January 2006 <br /> (4) EMS reduced gasoline usage,but increased diesel usage due to replacement of older gasoline <br /> powered ambulances with newer,diesel powered models. <br /> ENERGY USE <br /> NATURAL GAS <br /> Usage(Therms) January-May 2006 <br /> Actual Baseline Projection Diff.(Actual-Baseline) %Difference from Baseline <br /> May 9,145 8,725 420 4.812% <br /> Year-To-Date 96,755 97,520 -1,065 -1.09% <br /> ELECTRICITY <br /> Usage(KW)January-May 2006 <br /> Month Actual Baseline Projection Diff.(Actual-Baseline) % Difference from Baseline <br /> May-06 405,624 412,391 (6,766) -1.64% <br /> Year-To-Date 2,103,664 2,170,323 -66,659 -3.07% <br /> Public Works developed a model to estimate changes in energy usage from a two-year baseline period(January 2004 <br /> through December 2005). This model is used to effectively"remove"or adjust for the effect of outside air temperatures <br /> (Heating Degree Days(HDD)and Cooling Degree Days(CDD))on energy use in County buildings. <br /> "Actual"usage presents the number of kilowatt hours used during the most recent month as well as usage for the <br /> calendar year to date. "Baseline Projection"is a projection of the quantity of electricity that would have been used, <br /> adjusted for HDD and CDD,based on usage in the two-year baseline period. The"Difference,"if a negative value, <br /> demonstrates that less energy was used than projected,resulting in a savings. If a positive value,the"Difference" <br /> indicates that more energy was used than projected. <br /> In order to allow appropriate"apples-to-apples'comparisons to direct changes in usage,outside lighting has not been <br /> included,as accounts are often rolled up for several buildings(i.e.,outside lighting for the Government Services Annex <br /> includes not only the Annex but also Government Services Center,the Sheriff Department and the New Courthouse). <br /> 1 <br />