Browse
Search
Agenda - 05-02-2017 - 8-d - Contract Extension for Household Hazardous Waste Collection - Clean Harbors Environmental Services
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 05-02-2017 - Regular Mtg.
>
Agenda - 05-02-2017 - 8-d - Contract Extension for Household Hazardous Waste Collection - Clean Harbors Environmental Services
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 3:55:20 PM
Creation date
11/1/2017 10:14:38 AM
Metadata
Fields
Template:
BOCC
Date
5/2/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8d
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
35 <br /> /'. <br /> 11. Does the current$0.60/pound rate alluded to in the pre-bid meeting include transportation <br /> of wastes? <br /> Yes it includes transportation,$0.60 per pound Includes everything except labor <br /> 12. Is one contractor currently providing all of these services both onsite collection and disposal? <br /> Are you planning on continuing this for the new contr ct? <br /> The current contractor is providIng everything;onsite collection, hauling and disposal. We are <br /> contractor Uof� v�e VVe dtobe ' � of planning n8nnr the nem/oon ra rcontinuing those sose services. need made any <br /> subcontractors that are used and the subcontractors must be approved by us beforehand. <br /> 13. Does the county provide the container utUi zu dto package the waste orw|Uth opni pricing <br /> submitted for disposal needto include packaging . <br /> The current pricin includes everything except?xcept labor. Collection, hailing, processing,+dlsposirig,and <br /> a!Iof the material used on site including tools, boxes,55 gallon drums, etc. <br /> 14. will the contractor have storage onsite at the collection location for equipment ancl supplies? <br /> If yes what type of building and what is the area i.e.what is the storage capacity? <br /> The storage facility at 1514 Eubanks Road has a shelter for employees,a large processing area and <br /> two storage buildings. One building is 12'x 16' and the other is 14'x 20'.There is also a covered <br /> area with secondary containment that is used for storage that is about 131x20'. <br /> ( <br /> 15. Please provide drawings or diagrams of the existing HHW storage area. <br /> See Attached (1514 Eubanks Road Facility).We currently only have large blue prints of the <br /> processing building.The illustration provided is a rough sketch of the location. If you need the <br /> exact blue print of the processing building please let us know; <br /> 16. You have a single per lb unit price in the bid schedule for Household Hazardous Waste <br /> collection and processing, Is this unit price to include everything except the onsite per labor rate? <br /> In other words are we to include disposal, packaging,transportation,testing and all other costs <br /> under this single per lb unit price for all waste categories? <br /> The per pound price includes everything except labor. ' <br /> 17. What was the total contraet spending on the current HHW contract in each of the last two <br /> complete fiscal years? | <br /> FYO91D=$166,290.9O and FY1O1l= $159,003.60 <br /> 18. Are lamps included in the collection service and if so does it include all categories of lamps <br /> compact fluorescent, straight fluorescent, HID,arid incandescent, etc? <br /> Orange County will be handling all Lamps.The HHW Vendor will not be responsible for handling <br /> ( them. <br /> Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.