Browse
Search
Agenda - 05-02-2017 - 7-b - Countywide Radio Communications Needs Assessment and Alternatives Report
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 05-02-2017 - Regular Mtg.
>
Agenda - 05-02-2017 - 7-b - Countywide Radio Communications Needs Assessment and Alternatives Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 3:39:28 PM
Creation date
11/1/2017 10:14:33 AM
Metadata
Fields
Template:
BOCC
Date
5/2/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7b
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
omNV 6 <br /> i Orange County, North Carolina <br /> 41 w�I1V"�+��Ir�o '��I�M C. <br /> o Air Il i Y Selected Replacement Radio Solution <br /> Recommendation Report <br /> • New sites constructed will be equipped with microwave backhaul for interconnecting <br /> the sites to the core equipment and dispatch consoles. This microwave backhaul will <br /> have excess capacity that may be used for other County purposes. <br /> • New sites constructed that include new towers should include the ability to support <br /> future growth (additional antennas and users). The County can use the future growth <br /> capacity to support expansion of the radio system(s) or to support other wireless <br /> systems, such as broadband. <br /> • Building the system over time does not provide a solution that meets all radio <br /> coverage needs in one step. The County will not recognize full countywide radio <br /> coverage improvements. This multi-step approach requires a more complex <br /> transition/migration plan for each step. <br /> Following County approvals of the selected replacement radio solution plan and <br /> funding, the County should proceed to the next phases of the project, which consist of: <br /> • Preparing technical specifications and a request for proposal (RFP) for Step 1 <br /> • Executing an interlocal agreement with Durham County for core equipment use <br /> • Evaluation of vendor proposals <br /> • Vendor contract and price negotiations, and contract award <br /> • Step 1 system implementation <br /> Page 4 of 4 <br /> April 14, 2017 ;Tv �" <br /> eery,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.