Orange County NC Website
2 <br /> On February 11, 2016 Orange County received eight responses to its Request for Qualifications <br /> ("RFQ") issued on January 14, 2016 for Design-Build services for the Sportsplex Field House in <br /> accordance with North Carolina Procurement Law regarding procurement of Design-Build <br /> services. A staff panel consisting of members from the Manager's Office, the Department of <br /> Environment, Agriculture, Parks & Recreation ("DEAPR"), the Sportsplex Management Staff, <br /> Finance & Administrative Services, and Asset Management Services evaluated presentations of <br /> selected firms and agreed to recommend the TA Loving Company to serve as the Design- <br /> Builder for this project. The responding firms were: <br /> Bobbitt Construction* <br /> Bordeaux-Boomerang Design* <br /> CT Wilson — Summit Design & Engineering <br /> Focus Design Builders <br /> TA Loving Company-CRA* <br /> Samet Corporation — SRS <br /> Resolute Building Company— LS3P <br /> J.M. Thompson-Apogee Group <br /> *firms selected to interview. <br /> The project program is developed as a collaborative partnership between the County and the <br /> Design-Build firm. The Design-Build firm has a design and construction component; the County <br /> will be contracting with one entity for the most efficient delivery of an engineered pre-fabricated <br /> steel field house structure. TA Loving will retain Corley, Redfoot Architects for the design <br /> services for the project. Through a pre-construction phase process, the County and TA Loving <br /> have developed a project developmental design and construction scope as well as the related <br /> the Guaranteed Maximum Price ("GMP"). <br /> Once authorized by the Board, this GMP becomes the basis of the Design-Build contract, which <br /> binds the Design-Builder to the agreed upon not-to-exceed price unless Orange County <br /> changes the scope of the project in some manner. The GMP will include appropriate <br /> contingency funds. Any un-allocated balance of these funds as well as savings resulting from <br /> identified value-engineering activity will be returned to the County. This method allows for <br /> significant, collaborative cost efficiencies with the full benefit of the Design-Build firm during the <br /> entire project to illuminate cost-benefit factors, appropriate value engineering, and leverage the <br /> competencies of the Design-Build firm in constructing pre-engineered steel structures on a <br /> construction site adjacent to an active, intensely use Sportsplex complex. <br /> The site has two small residential units on site that will be de-constructed as part of the project. <br /> One unit is not salvageable; however Asset Management and Housing, Human Relations and <br /> Community Development staff continue to analyze options with County affordable housing <br /> partners to potentially relocate and rehabilitate the second residential unit in order to keep it in <br /> the affordable housing inventory. Disposition of this housing unit would be confirmed prior to <br /> the start of construction. <br />