18 <br /> 6 <br /> Contract Documents and an affidavit of the Design-Builder that progress payments theretofore <br /> received from the Owner on account of the Work have been applied by the Design-Builder to <br /> discharge in full all the Design-Builder's obligations incurred in connection with Work covered by <br /> all prior applications for payment. See paragraph 19.2. <br /> 1.33 Resident Superintendent -That person designated by the Design-Builder in accordance <br /> with paragraph 7.2 who has day-to-day responsibility for the prosecution of the Work and the <br /> obtaining of proper materials and equipment, and adequate labor and who shall have the <br /> authority set forth in the last sentence of paragraph 7.2. <br /> 1.34 Schedule of Values—The agreed upon breakdown of the Contract Price which may be <br /> required by the Contract Documents, and designated as such. See paragraph 19.1. <br /> 1.35 Service Instruments or Instruments of Service refer to representations of the creative work <br /> of the Design-Builder and may include drawings, sketches, specifications, or similar items. <br /> 1.36 Specifications -That portion of the Contract Documents consisting generally of the written <br /> requirements for materials, equipment, construction systems, standards, and workmanship for <br /> the Work and performance of related services. <br /> 1.37 Subcontractor-A person, firm, or corporation who has entered into a direct contract with <br /> the Design-Builder or Contractor to perform any of the Work at the Project or a person or entity <br /> supplying materials to be used or consumed in the completion of the Work. <br /> 1.38 Submittal - Shop drawings, product data, samples, and other documents required by the <br /> Contract Documents to be submitted by the Design-Builder to the Owner. <br /> 1.39 Submittal Register- See paragraph 12.2 of these Supplementary Conditions. <br /> 1.40 Substantial Completion -The point at which the Work, and Work by other Contractors on or <br /> in connection with the Project, is sufficiently complete, as determined by the Owner's Authorized <br /> Representative, in accordance with the Contract Documents that it can be beneficially occupied <br /> by the Owner, and the Work can be utilized by the Owner for its intended use, and all necessary <br /> permits and permissions for Beneficial Occupancy and utilization having been obtained by the <br /> Design-Builder. All operations and maintenance manuals, Owner training, and as-built drawings <br /> must be submitted prior to Substantial Completion being achieved. <br /> 1.41 Sub-subcontractor-A person or entity that has a direct or indirect contract with a <br /> Subcontractor to perform any of the Work at the Project or a person or entity supplying materials <br /> to be used or consumed in the completion of the Work. <br /> 1.42 Work-The construction and services required by the Contract Documents, including all <br /> labor, materials, equipment, and services provided or to be provided by the Design-Builder to <br /> fulfill the Design-Builder's obligations. <br /> 1.43 All references in the Contract Documents to the masculine shall be interpreted as including <br /> the feminine or neuter and all references in the Contract Documents to the singular or the plural <br /> shall be interpreted as including the other, as may be appropriate in the reasonable <br /> interpretation of the Contract Documents. <br /> Revised 2/17 <br />