Browse
Search
Agenda - 05-02-2017 - 6-d - Award of Design-Build Agreement – Sportsplex Field House Project
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 05-02-2017 - Regular Mtg.
>
Agenda - 05-02-2017 - 6-d - Award of Design-Build Agreement – Sportsplex Field House Project
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 3:37:59 PM
Creation date
11/1/2017 10:14:29 AM
Metadata
Fields
Template:
BOCC
Date
5/2/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6d
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 <br /> 5 <br /> provided that proof of delivery is obtained. In the case of delivery in person, such delivery shall <br /> not be effective unless and until a written and signed receipt showing the date and time of <br /> delivery is obtained. <br /> 1.24 Notice to Proceed - See paragraph 12.3. <br /> 1.25 Owner-The Owner is the person or entity designated as such in the Agreement. However, <br /> when any notice or request is required by the Contract Documents to be made to Owner and <br /> Owner's Authorized Representative Owner refers to the Orange County Manager or authorized <br /> designee. <br /> 1.26 Owner's Authorized Representative (or"Owner's Representative")-A person, or persons, <br /> employed by the Owner and designated from time to time by written notice to the Design-Builder <br /> to administer the Contract Documents, and to observe and monitor the Work on behalf of the <br /> Owner with authority and responsibility as herein specified. <br /> 1.27 Payment Bond —A bond given by a surety to cover any amounts that, because of Design- <br /> Builder's default, are not paid to a subcontractor or materialman. The Payment Bond required <br /> herein shall be in an amount equal to one hundred percent (100%) of the contract value and <br /> shall comply with Article 3 of Chapter 44A of the North Carolina General Statutes. <br /> 1.28 Performance Bond—A bond given by a surety to ensure timely performance of a contract <br /> and all Work associated therewith. The Performance Bond required herein shall be in an <br /> amount equal to one hundred percent (100%) of the contract value and shall comply with Article <br /> 3 of Chapter 44A of the North Carolina General Statutes. <br /> 1.29 Project -The total design and construction of which the Work performed under the <br /> Contract Documents may be the whole or a part. <br /> 1.30 Project Manager-That person designated by the Design-Builder in accordance with <br /> paragraph 7.2 who shall be in general charge of the Work and its performance and who shall <br /> have the authority set forth in the last sentence of paragraph 7.2. <br /> 1.31 Request for Information -A written communication from the Design-Builder to the Owner <br /> for any interpretation of, or information needed, required, or desired under the Contract <br /> Documents. The Owner reserves the right to determine the reasonable format and contents <br /> required for a Request for Information. In any Request for Information, the Design-Builder shall <br /> state a reasonable date by which a response is necessary in order to avoid delay in progress on <br /> the Work and shall make such request sufficiently in advance of such date as to avoid any such <br /> delay. The Designer shall respond in writing to the Request for Information by the date stated by <br /> the Design-Builder unless he cannot reasonably do so, in which case he shall prior to that date <br /> notify the Design-Builder of the date by which he can reasonably respond. The Design-Builder <br /> shall not be entitled to any additional time for the completion of the Work or any portion thereof <br /> by reason of the Designer's failure to respond if he has not submitted its Request for Information <br /> sufficiently in advance to allow the Designer a reasonable time within which to respond. <br /> 1.32 Request for Payment - The form, in the form of AIA Document G702 (latest ed.) or other <br /> published document approved by Owner, which is to be used by the Design-Builder in <br /> requesting progress payments and which is to include a Schedule of Values as required by the <br /> Revised 2/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.