Browse
Search
Agenda - 05-02-2017 - 6-c - Amendments to the Water and Sewer Management, Planning, and Boundary Agreement
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 05-02-2017 - Regular Mtg.
>
Agenda - 05-02-2017 - 6-c - Amendments to the Water and Sewer Management, Planning, and Boundary Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2017 3:38:55 PM
Creation date
11/1/2017 10:14:27 AM
Metadata
Fields
Template:
BOCC
Date
5/2/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6c
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> • Designating 87.5 acres "Primary Service Area". This area is currently "Hillsborough <br /> Long-Term Interest Area". Designating the area "Primary Service Area" would allow <br /> extension of public water and sewer systems into the area. <br /> In the interest of disclosure, Orange County has received a Master Plan Development <br /> conditional zoning application that includes a large portion of the area proposed to become <br /> "Primary Service Area" (the area east of Old Highway 86). These WASMPBA amendments are <br /> prerequisites to considering amendments to land use and zoning designations that would allow <br /> for greater development potential in this general area, an area in which Orange County is <br /> planning to invest approximately $1.6 million in sewer infrastructure. The area proposed for <br /> addition to the Primary Service Area is serviceable by gravity sewer. <br /> Town of Carrboro ETJ/Smith Level Road Area <br /> Town of Carrboro and OWASA staff began researching the status of this area when contacted <br /> by a person interested in possibly developing in the southern portion of the area proposed for <br /> "Primary Service Area" designation. As the map in Attachment 3 shows, many parcels in this <br /> area are already served by OWASA water and sewer systems, and have been since long <br /> before the WASMPBA was adopted (some services go back to the 1960s). The Town of <br /> Carrboro's long-time zoning designation for the area is R-10 (Residential, 10,000 square feet <br /> per dwelling unit), which is too small a lot size on which to locate well and septic systems. <br /> Staffs are at a loss to explain why this area was not designated "Primary Service Area" when <br /> the WASMPBA was adopted in 2001, particularly since the area is not listed in the text of the <br /> Agreement (Section IV of Agreement in Attachment 4) as an exception area. Nevertheless, the <br /> adopted WASMPBA map currently designates the area in question as "OWASA Long-Term <br /> Interest Area" so new water or sewer connections cannot be permitted. <br /> The proposed amendments in the Smith Level Road Area include: <br /> • Designating 20.6 acres "Primary Service Area". <br /> Attachment 1 is a Resolution to approve the amendments with maps depicting the geographic <br /> extent of the amendment areas. The map in Attachment 2 shows the overall WASMPBA map <br /> with the proposed amendments overlaid on the map. <br /> All signatory parties to the Agreement must approve the amendments before they are effective. <br /> Proposed dates for adoption consideration are: <br /> Orange County May 2, 2017 <br /> Town of Carrboro May 16 <br /> Town of Hillsborough June 12 <br /> Town of Chapel Hill June 12 <br /> OWASA May 25 or June 8 <br /> SOCIAL JUSTICE IMPACT: The following Orange County Social Justice Goal is applicable to <br /> this agenda item: <br /> • GOAL: ESTABLISH SUSTAINABLE AND EQUITABLE LAND-USE AND <br /> ENVIRONMENTAL POLICIES <br />
The URL can be used to link to this page
Your browser does not support the video tag.