Orange County NC Website
4 <br /> INTERLOCALAGREEMENT BETWEEN ORANGE COUNTY AND THE TOWN OF HILLSBOROUGH FOR CONSTRUCTION AND <br /> OPERATION OF WATER AND SEWER FACILITIES IN THE HILLSBOROUGH AREA ECONOMIC DEVELOPMENT DISTRICT OF <br /> ORANGE COUNTY <br /> (10 days after Town of Hillsborough's receipt of a proposal and/or other response to Orange <br /> County's request for proposals) to a designer and its proposed fee structure, Orange County <br /> may award a contract to the designer for such design in which the proposed fee structure <br /> applies. <br /> 3. Construction. Orange County will solicit bids for the construction of the water and sewer <br /> infrastructure. Orange County will share the proposals with the Town of Hillsborough before <br /> awarding any bid or contract for construction of the infrastructure. The Town of Hillsborough <br /> will pay the cost of construction and pro-rata share of the related engineering and construction <br /> engineering & inspection services for those sections of the water and/or sewer infrastructure <br /> lying outside the county economic development zone. If the Town of Hillsborough does not <br /> choose to extend and pay for the aforesaid sections of the infrastructure and acceptable design <br /> alternatives exist,the remaining aspects of the project can continue and terminate at the EDD <br /> land use line with the infrastructure improvements solely financed by Orange County. By <br /> authorizing their respective managers to sign this agreement,the parties' governing bodies also <br /> authorize them to agree to suspend or abandon the process if the managers jointly determine it <br /> is prudent to do so. If the managers do not jointly agree it is prudent to suspend or abandon the <br /> process, it is agreed that suspension or abandonment will not be affected unless the parties' <br /> governing bodies jointly agree to suspend or abandon the process. Except as otherwise <br /> provided herein, should either party unilaterally suspend or abandon the process, such party <br /> shall be responsible for the costs obligated by this Agreement pro-rated to the time of <br /> suspension or abandonment, as contractually obligated. <br /> 4. New Development and Buildings. Non-Residential development shall be consistent with the <br /> joint land use plan and county zoning. Individual or commercial water and sewer connections <br /> and other public uses shall be subject to the utility approval of the Town of Hillsborough even <br /> though the development site(s) may not be annexed. Provided, however, such approval shall <br /> not be unreasonably withheld and shall be based on the availability of capacity in the Town's <br /> water and sanitary sewer systems and the ability of the Town's water and sewer systems to <br /> provide service within the Town's entire service area. All water and sewer connection <br /> approvals shall comply with the resources available to the Town of Hillsborough and shall be <br /> consistent with the Water and Sewer Management Planning and Boundary Agreement <br /> Map(WASMPBA, see Exhibit B). A reservation of gallons 108,000 per day (GPD) sewer <br /> capacity and 108,000 GPD water capacity will be made available to subject properties The <br /> Town of Hillsborough acknowledges that industrial, office, and commercial uses are intended <br />