Browse
Search
Agenda - 04-27-2017 - 1 - Consideration of the Final Draft Durham – Orange Light Rail Cost Sharing Agreement and Final Draft Orange County Transit Plan
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 04-27-2017 - Work Session
>
Agenda - 04-27-2017 - 1 - Consideration of the Final Draft Durham – Orange Light Rail Cost Sharing Agreement and Final Draft Orange County Transit Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 3:09:56 PM
Creation date
11/1/2017 10:14:13 AM
Metadata
Fields
Template:
BOCC
Date
4/27/2017
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
76 <br /> Orange County Transit Plan April 25, 2017 <br /> Figure 5.4-2. Projected Debt Service Coverage Ratios: Federally-Funded Limited Obligation Bonds(LOBs) <br /> 1-) <br /> 10 <br /> 8 <br /> 4 <br /> 2 <br /> 0 <br /> 00 M. e <br /> -- -I. <br /> C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� C� <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Figure 5.4-1. Projected Debt Service Coverage Ratios: Locally-Funded Limited Obligation Bonds(LOBS) &TIFIA Loans <br /> 4 <br /> 3_5 <br /> 3 <br /> 2-5 <br /> 2 <br /> 1.5 <br /> 0.5 <br /> 0 <br /> Final Page 52 of 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.