Browse
Search
Agenda - 04-27-2017 - 1 - Consideration of the Final Draft Durham – Orange Light Rail Cost Sharing Agreement and Final Draft Orange County Transit Plan
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 04-27-2017 - Work Session
>
Agenda - 04-27-2017 - 1 - Consideration of the Final Draft Durham – Orange Light Rail Cost Sharing Agreement and Final Draft Orange County Transit Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2017 3:09:56 PM
Creation date
11/1/2017 10:14:13 AM
Metadata
Fields
Template:
BOCC
Date
4/27/2017
Meeting Type
Work Session
Document Type
Agenda
Agenda Item
1
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
62 <br /> Orange County Transit Plan April 25, 2017 <br /> transportation project funding cycle, which will conclude with <br /> an adopted State Transportation Improvement Program in June <br /> 2019. GoTriangle plans to enter the D-O LRT Project into the The operating cost is projected as$28.7 million YOE for the first <br /> state process to compete for the full ten percent state share for year (fiscal year 2029). After applying fare revenues and state <br /> which the project is eligible. and federal grants, operating costs will be funded using the <br /> dedicated Tax District Revenue in Durham and Orange <br /> The anticipated capital funding plan for the project is presented Counties. This will allow local funds that currently operate bus <br /> in Table 4.6-3. GoTriangle is seeking a 50 percent grant from the routes that will replaced by the D-O LRT Project to be <br /> FTA Section 5309 New Starts program, which is consistent with reallocated. Orange County's share of the operating cost is 20 <br /> the federal share awarded other New Starts projects. The percent through June 30, 2036; thereafter, its share of the D-O <br /> amount of funds committed from the dedicated Tax District LRT operating cost is 19 percent. <br /> Revenue in Durham and Orange counties is$887.9 million YOE, <br /> of which Orange County's share is $149.5 million in this Plan. <br /> The remaining capital funds are planned from state grants, <br /> private monetary and in-kind donations, and other funds <br /> specifically identified for the Joint Development component. FTA requires that agencies plan for funding needs associated <br /> with capital asset replacement, referred to as "State of Good <br /> Table 4.6-3: D-O LRT Project Capital Funding Plan (YOE millions) Repair." This includes items such as light rail vehicle <br /> replacement every 25 years and major track work overhaul <br /> Mi e - Ma 9 MY7--_ a every 20 to 35 years.The first such expenditure for the D-O LRT <br /> Other Funds $1,367.3 $1,588.4 Project is anticipated in 2040, with expenses continuing <br /> Dedicated Local Revenues $455.7 $887.9 periodically thereafter for the duration of light rail operations. <br /> Durham County Portion $351.2 $738.4 The total local share of these State of Good Repair costs is <br /> Orange County Portion $104.5 $149.5 assumed to be 30 percent. Orange County's portion of the local <br /> Total $1,823.0 $2,476.3 share of the capital asset replacement expenses is 19 percent. <br /> Though the D-O LRT Project will compete for a full ten percent <br /> share from state funding, this funding is not guaranteed and Funding for the D-O LRT Project is committed through the Cost- <br /> could cover a lesser amount than ten percent of the full project Sharing Agreement executed along with this Plan and which is <br /> cost. Further information about financial assumptions is incorporated into the annual Work Plan (see Sections 6.2 and <br /> included in Section S. <br /> 6.5). <br /> Final Page 38 of 65 <br />
The URL can be used to link to this page
Your browser does not support the video tag.