Browse
Search
Agenda - 06-13-2006-9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 06-13-2006
>
Agenda - 06-13-2006-9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 8:58:32 AM
Creation date
8/29/2008 9:34:32 AM
Metadata
Fields
Template:
BOCC
Date
6/13/2006
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 20060613
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q <br />11. Proposed Master Plan Committee <br />A. Charge <br />1, DEVELOP A MASTER PLAN FOR THE NEW HOPE PARK AT <br />BLACKWOOD FARM SITE, WITHIN THE FRAMEWORK OF THE <br />PRE-CONCEPT PLAN, GUIDING PRINCIPLES (PLEASE SEE <br />ATTACHMENT 1) AND OTHER DIRECTION PROVIDED FROM THE <br />BOARD OF COMMISSIONERS. <br />2. THE MASTER PLAN SHOULD INCLUDE THE FOLLOWING <br />COMPONENTS: <br />a. A master plan map for thepark. The plan map should include all proposed <br />buildings, playing fields, other fields, roads, parking, facilities, and <br />amenities, as well as vegetative cover, hydrology and other components <br />that are commonly included in park master plans. <br />b. A written report in support of the master plan map, outlining the proposed <br />uses, the design rationale, description of work group process, natural and <br />cultural features, existing and proposed land uses, means of soliciting <br />community input, potential future phases, and construction cost estimates. <br />3. THE MASTER PLAN WILL ADDRESS CO- LOCATION OF <br />PROPOSED FACILITIES WITH THE GOAL OF PROVIDING FOR <br />SYNERGIES OF USE AND APPROPRIATE TRANSITIONS BETWEEN <br />DIFFERENT COMPONENTS OF THE PARK. <br />4. THE BOARD OF COMMISSIONERS WILL SUBSEQUENTLY <br />ADDRESS PHASING, OPERATION AND MAINTENANCE <br />RESPONSIBILITIES OF THE PARK. <br />B. Product and Timeframe <br />A Master Plan report and map, as described above, by January <br />31, 2007 ** <br />Timeframe: May 2006 -- January 2007 ** <br />** - subject to change based on actual start date of the master plan design <br />
The URL can be used to link to this page
Your browser does not support the video tag.