Browse
Search
Agenda - 06-13-2006-9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2006
>
Agenda - 06-13-2006
>
Agenda - 06-13-2006-9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2013 8:58:32 AM
Creation date
8/29/2008 9:34:32 AM
Metadata
Fields
Template:
BOCC
Date
6/13/2006
Document Type
Agenda
Agenda Item
9b
Document Relationships
Minutes - 20060613
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2006
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Master Plan Process <br />Adopted — March 21, 2006 <br />3 <br />To begin the planning for the proposed New Hope Park at <br />Blackwood Farm (working title), the following is offered as a draft <br />process for the Board's consideration. This draft is based on <br />discussions by staff and comments from the Board at the time of <br />acquisition in late 2001. <br />This draft process for a Master Plan Work Group is designed to <br />comprehensively integrate the many and varied components of <br />this 152 -acre site, located near the intersection of NC 86 and New <br />Hope Church Road. <br />I. Tentative Schedule of Activities* <br />Action <br />Master Plan process and charge approved <br />Date <br />March, 2006 <br />Master Plan Work Group appointed / <br />Preliminary Concept Plan approval <br />May 16, 2006 <br />Work Group begins work <br />June <br />Surveys authorized and conducted <br />June-August <br />Interim report to Board of Commissioners <br />October <br />Work Group completes Master Plan <br />January 31, 2007 <br />Board of Commissioners reviews, modifies <br />and approves Master Plan <br />February- March, 2007 <br />Site plan approval, engineering, construction <br />and bid documents completed <br />TBA <br />-drawings <br />Finalize and solicit bids, Board awards <br />contract <br />TBA <br />Construction of park - completed <br />TBA <br />Park Opens <br />TBA <br />* subject to change <br />
The URL can be used to link to this page
Your browser does not support the video tag.