Browse
Search
Agenda - 02-21-2017 - 7-c - Durham Chapel Hill Carrboro Metropolitan Planning Organization Comprehensive Transportation Plan – Comments and Endorsement
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 02-21-2017 - Regular Mtg.
>
Agenda - 02-21-2017 - 7-c - Durham Chapel Hill Carrboro Metropolitan Planning Organization Comprehensive Transportation Plan – Comments and Endorsement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 4:32:36 PM
Creation date
11/1/2017 10:13:22 AM
Metadata
Fields
Template:
BOCC
Date
2/21/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
7c
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 1 3 <br /> Hillsborough & Northern Orange County DRAFT <br /> Key CTP Highway Recommendations <br /> O Z W TONG ST .±z <br /> O n TE <br /> g O• <br /> / 0 . _ -.411ffe,447 m•40 4 <br /> 4 <br /> ---- ---------"-------- \.,-•-. -- ,-...-.-.---- <br /> 7 :v Hillsborough -- <br /> ' .......-, /-:: \• <br /> .. ..n Hillsborough <<o,c •,+ !NIT(,',L;r <br /> 5 2 <br /> i <br /> Miles <br /> 0 0.5 1 1.5 2 - -a <br /> 4 1 <br /> No. Facility Project Location Status Recommendation <br /> 1 1-40 1-85 to NC 86 Needs Imp. Widen freeway to 6 general purpose <br /> lanes. <br /> 2 1-85 1-40 to Durham Needs Imp. Widen freeway to 6 general purpose lanes <br /> County with a raised median. <br /> 3 US 70 1-85/US 70 Needs Imp. Widen to a 4-lane divided cross section <br /> Connector to US 70 with 5-foot bike lanes and 5-foot <br /> Alt sidewalks separate from travel lanes. <br /> 4 1-85/ 1-85 to US 70 Needs Imp. Improve existing 1-85/US 70 Connector <br /> US 70 interchange with US 70 to a full- <br /> Connector movement interchange. <br /> 5 S Churton St Eno River Bridge to Needs Imp. Widen to a 4-lane divided cross section <br /> (US 70/NC 86/ 1-40 with a raised median with bike lanes and <br /> SR 1009) sidewalks. <br /> 6 Orange Grove New Location-- Recomm. Construct a new 4-lane divided boulevard <br /> Rd Extension S Churton St to US New Facility facility with bicycle, pedestrian and bus <br /> 70 Bus accommodations. <br /> 7 NC 86 US 70 Bus to Old Needs Imp. Widen to a 4-lane divided cross section <br /> NC 10 with a raised median with bike lanes and <br /> sidewalks. <br /> 8 NC 86 US 70 Byp Needs Imp. Improvements are needed to <br /> (Cornelius St)to accommodate projected traffic and to <br /> north of the NC improve pedestrian safety. Further study <br /> 86/NC 57 split is needed for specific improvements. <br /> 9 Eno Mountain Eno Mountain Rd Recomm. Realignment of Eno Mountain Rd at the <br /> Rd (SR 1148) to intersection of New Facility intersection of Mayo St and Orange Grove <br /> Realignment, Mayo St and Rd with on-road bicycle, pedestrian and <br /> TIP#U-3436 Orange Grove Rd bus accommodations. <br /> 10 New Collector Orange Grove Rd Recomm. Construct new minor thoroughfare with <br /> Rd (1) Extension to New Facility bicycle and pedestrian accommodations. <br /> Millstone Dr Further study is needed for cross section. <br /> 11 New Collector Intersection of Recomm. Construct new minor thoroughfare with <br /> Rd (2) Mayo St and S New Facility bicycle and pedestrian accommodations. <br /> Churton St to New Further study is needed for cross section. <br /> Collector Rd (1) <br /> Note: This map and table shows only key highway 1 of 1 1/6/17 DRAFT <br /> Projects. See the draft CTP highway map for all projects. <br />
The URL can be used to link to this page
Your browser does not support the video tag.