Orange County NC Website
both for direct field work as well as time spent in planning the studies and analyzing the data <br />While staff time can be considered as an in-kind contribution, other projects were delayed in <br />order to engage in this study, Staff costs include time for collecting water samples and <br />conducting the telephone interviews ($14,354) and time for planning the studies and analyzing <br />the data ($14,820). <br />RECOMMENDATION(S): The Manager recommends that the Board receive the Report. <br />