Browse
Search
Agenda - 02-21-2017 - 6-g - Contract Award for Engineering and Environmental Services with SCS Engineers
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 02-21-2017 - Regular Mtg.
>
Agenda - 02-21-2017 - 6-g - Contract Award for Engineering and Environmental Services with SCS Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 4:27:10 PM
Creation date
11/1/2017 10:13:07 AM
Metadata
Fields
Template:
BOCC
Date
2/21/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6g
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
63 <br /> Union County Solid Waste Management SCS ENGINEERS <br /> Landfill Stormwater NPDES Permitting. SCS staff assisted the <br /> County in obtaining a NDPES general permit for stormwater <br /> discharges from the County's landfill property. To obtain the <br /> NPDES permit the stormwater outfalls and possible pollutants <br /> from the property were determined by SCS staff as well as <br /> preparing an outfall and site map drawing. In addition, a permit <br /> application was prepared including a description of the landfill <br /> operations. <br /> Annual Regulatory Landfill Disposal and Airspace Reporting. <br /> Annually SCS provides a topographic survey of the active <br /> portions of the C&D Landfill and calculates the yearly landfill <br /> volume used for waste disposal, waste tonnages, landfill <br /> volume remaining and in-place waste density. SCS takes this <br /> information and provides a reporting documentation to the <br /> County and NCDENR. <br /> In addition to the reporting documentation, SCS provides to the <br /> County expected landfill life based on current and projected <br /> C&D waste disposal tonnages, yearly calculated waste-to-cover <br /> ratios and densities and updates schedule for landfill closure <br /> and construction including corresponding costs. <br /> Project Profile <br />
The URL can be used to link to this page
Your browser does not support the video tag.