Orange County NC Website
58 <br /> SCS ENGINEERS <br /> Landfill Gas Control , Compliance, and Permitting <br /> North Wake Landfill <br /> Raleigh , North Carolina <br /> Client Reference SCS has been retained by Wake County's Solid Waste <br /> John Roberson, PE, Director Management Division and by the County's Facilities Design <br /> Lee Squires, PE,Facilities Manager and Construction Department to perform landfill gas (LFG) <br /> Johnny Beal,Facilities Manager evaluations, regulatory compliance and permitting, LFG control <br /> Wake County Solid Waste <br /> Management Division system design, CQA, testing, control system operations and <br /> 919.856.6365 repairs, monitoring, landfill gas-to-energy (LFGE) project <br /> 919.518.0274 technical support, and greenhouse gas emission reduction <br /> John Roberson, PE (carbon credit) studies for the Feltonsville, North Wake, East <br /> Wake County Facilities Design& Wake, and/or South Wake landfills. Task assignments specific <br /> Construction Department to North Wake Landfill are described below. <br /> 919.856.6365 <br /> Clean Air Act (CAA) Permitting & Compliance. SCS has <br /> Contract Amount: >$900,000 assisted the County and provided interface with NCDENR <br /> Date: 1999 to present regarding compliance with the New Source Performance <br /> Standards (NSPS), Title V Air Operating Permit, and National <br /> Key Personnel Emission Standards for Hazardous Air Pollutants (NESHAP) <br /> Bob Dick, PE, Project Director requirements applicable to the North Wake and South Wake <br /> Jim Michelsen,Technical Advisor <br /> Brandon King, Project Scientist Landfills. Specific activities have included development of the <br /> Nick Guarriello, Staff Engineer NSPS Design Plan, annual emissions inventory for regulated <br /> criteria and toxic air pollutants, Semi-annual NSPS/Title <br /> Highlights V/SSM Plan reports, conduct routine surface emissions <br /> ✓ LFGE Economic Analysis monitoring, consulting during NCDENR air inspections, <br /> ✓ Coordination w/ LFGE preparation of the Startup, Shutdown, and Malfunction (SSM) <br /> Developer Plan for the LFG system in accordance with the MACT Rule. <br /> ✓ GHG Pump Test <br /> ✓ LFG Recovery Projections <br /> ✓ LFG Migration Control LFG Migration Control and Remediation. SCS provided <br /> ✓ Air Permitting services pertaining to LFG migration control and remediation at <br /> ✓ Regulatory Compliance and the North Wake Landfill (as well as at the South Wake and <br /> Interface Feltonsville Landfills). Responsible for preparation of solid <br /> ✓ LFG Remediation Plan waste permit amendment documents, regulatory compliance <br /> ✓ Monitoring and Reporting <br /> ✓ Emissions Inventory and negotiations with NCDENR pertaining to landfill post- <br /> ✓ Sampling and Evaluations closure programs related to environmental monitoring and <br /> remediation. Specific activities have included development of <br /> LFG Remediation Plans, LFG System operational efficiency <br /> evaluation, LFG monitoring probe installation and <br /> "- decommissioning, communications with NCDENR regarding <br /> monitoring data and remediation approach, conduct routine <br /> I monitoring and reporting for the LFG perimeter probe network. <br /> CQA and Construction Engineering. SCS performed CQA <br /> services of LFG monitoring probe installation and LFG control <br /> system construction, including numerous network <br /> modifications and LFG system expansions. <br /> Project Profile <br />