Browse
Search
Agenda - 02-21-2017 - 6-g - Contract Award for Engineering and Environmental Services with SCS Engineers
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2017
>
Agenda - 02-21-2017 - Regular Mtg.
>
Agenda - 02-21-2017 - 6-g - Contract Award for Engineering and Environmental Services with SCS Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2017 4:27:10 PM
Creation date
11/1/2017 10:13:07 AM
Metadata
Fields
Template:
BOCC
Date
2/21/2017
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
6g
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
56 <br /> Orange County, NC RFQ 5225 SCS ENGINEERS <br /> assessments, site selection, property acquisition, environmental permitting, operation plan <br /> development, solid waste facility benchmarking, ordinance development, solid waste plans, <br /> financial assessments, rate studies/audits, development of construction procurement <br /> documents, bid and RFP evaluation, contract negotiation, and bond financings. <br /> Charles Warren, PE is a Senior Project Engineer with 9 years of experience assigned to SCS' <br /> Richmond, VA office. He has experience in landfill design, cell construction,permitting, and <br /> closure design. He currently supports active landfill sites in Virginia with site planning, grading <br /> design, and regulatory reporting. He provides long term planning assistance to sites by <br /> evaluating airspace availability, estimates of future needs, and required timelines of future <br /> development. He also provides environmental services support to sites including erosion and <br /> sediment control plans, equipment selection assistance, and site design. <br /> 4 LITIGATION STATEMENT <br /> SCS has been in business since 1970, has offices throughout the United States and other parts of <br /> the world, and stands behind our work. An organization of our size and scale occasionally <br /> becomes involved in litigation. Of the matters we have been involved in the past, or are <br /> currently involved in, none are considered to be material to our operations or limit in any way <br /> our ability to perform the work described in this RFP response. <br /> Set forth in Appendix B is our litigation statement for matters relevant to errors or omissions <br /> attributed to SCS. This information is submitted on a confidential basis. <br /> 5 SCHEDULE OF FEES <br /> The 2017 Fee Schedule is attached in Appendix C. <br /> 6 PROOF OF INSURANCE <br /> This document is attached in Appendix D. <br /> 7 E -VERIFY AFFIDAVIT / IRAN DIVESTMENT ACT <br /> CERTIFICATION <br /> These documents are attached in Appendix E. <br /> 35 <br />
The URL can be used to link to this page
Your browser does not support the video tag.